12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table of Contents2 Description of the <strong>Project</strong> 2-22.1 <strong>Project</strong> Location and Setting 2-22.2 Existing Traffic and Forecasts 2-42.3 <strong>Project</strong> Design Details 2-62.3.1 Main <strong>Bridge</strong> 2-72.3.2 River Training Works 2-82.3.3 Approach Roads 2-142.3.4 <strong>Bridge</strong>-end-Facilities 2-152.3.5 Railway 2-182.3.6 Utility Crossings 2-182.3.7 Resettlement Sites 2-192.4 Summary of the Size or Magnitude of Operation 2-202.5 Sourcing of Resources for <strong>Project</strong> Implementation 2-212.6 Proposed Schedule for Implementation 2-222.7 Relevant Associated Components 2-252.7.1 Widening of Dhaka-Mawa Highway (N8) 2-252.7.2 Bypass Road in Group B of Rajuk 2-252.7.3 Railway Network Development 2-252.7.4 Gas Main Network Development 2-252.7.5 High Voltage Power Transmission Network Development 2-252.7.6 Telecommunication Network Development 2-25List of TablesTable 2-1: Current and Forecasted AADT. 2-4Table 2-2: Waiting time and journey time 2-6Table 2-3: Salient features of south bank RTW 2-10Table 2-4: Summary of bank type details (except Type 7) 2-11Table 2-5: Major components and sub-components of the project 2-20Table 2-6: List of bridges, culverts and underpasses on the approach road at Janjira side 2-20Table 2-7: List of the Materials and the Potential Sources during construction. 2-21List of FiguresFigure 2-1: <strong>Project</strong> Location and Setting Map 2-2Figure 2-2: Probable erosion vulnerable areas due to structural interventions 2-3Figure 2-3: Sub-components of the <strong>Project</strong> 2-7Figure 2-4: Cross-section of the main bridge 2-8Figure 2-5: River training works layout 2-9Figure 2-6: North Bank Type 6 (Geobags) Cross Section 2-12Figure 2-7: RTW typical cross-section (Type 2) 2-13Figure 2-8: 3-D presentation of sample off-take for distributaries. Wave protection elementsincluding staggered and projecting concrete blocks. 2-14Figure 2-9: Typical cross-section of approach road. 2-15Figure 2-10: Layout plan of Janjira Service area (SA2). 2-16Figure 2-11: Construction yard in Mawa side. 2-16Figure 2-12: Construction yard in Janjira side. 2-17Figure 2-13: Implementation Schedule of the <strong>Project</strong> 2-23Figure 2-14: Tentative Construction Schedule for the RTW 2-242-i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!