12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex 4-2: Impact Assessment MatrixEnvironmental Components<strong>Project</strong> Activities in Different PhasesConstruction yards1. Topography 2. Top Soil/Bed Material 3. River Flow 4. Drainage 5. Erosion/ScourInteractionWeightageDegree of ImpactShort TermLong TermPartly MitigableFully MitigableComposite Rating ValeImpact ValueInteractionWeightageDegree of ImpactShort TermLong TermPartly MitigableFully MitigableComposite Rating ValeImpact ValueInteractionWeightageDegree of ImpactShort TermLong TermPartly MitigableFully MitigableComposite Rating ValeImpact ValueInteractionWeightageDegree of ImpactShort TermLong TermPartly MitigableFully MitigableComposite Rating ValeImpact ValueInteractionWeightageDegree of ImpactShort TermLong TermPartly MitigableFully MitigableComposite Rating ValeImpact ValueDredging for development of Construction Yards √ 3 -3 √ √ -2 -6 √ 4 -1 √ √ -1 -4 √ 3 -1 √ √ -1 -3 √ 4 -1 √ √ -1 -4Mobilization of construction vehicles/materialsand and movement of barges/vehiclesClearing of sitesRemoving of top soils √ 3 -2 √ √ -1 -3 √ 4 -1 √ √ -1 -4Earth filling and compaction √ 2 -1 √ √ -1 -2 √ 3 1 √ 1 3 √ 4 -1 √ √ -1 -4Development of facilities for construction√ 4 -1 √ √ -1 -4activitiesStorage, batch mix and fabrication √ 4 -1 √ √ -1 -4Operation of Construction Yards √ 3 -3 √ √ -2 -6 √ 4 -3 √ √ -2 -8Public utility crossingsInstillation of high pressure gas pipeInstallation of high voltage lineInstallation of optical fibresOperation & Maintenance and regionaldevelopmentMain <strong>Bridge</strong> √ 4 -1 √ √ -1 -4 √ 4 -2 √ √ -2 -8River Training Works √ 4 3 √ 3 12Approach roads √ 3 -3 √ √ -2 -6Approach rails<strong>Bridge</strong> end facilitiesPublic utility crossingsAssociated componentsWidening of National Highway (N8) √ 2 2 √ 2 4 √ 3 -1 √ √ -1 -3 √ 3 -2 √ √ -1 -3Railway connectivity √ 2 2 √ 2 4 √ 3 -2 √ √ -1 -3Construction of public utilitiesImpacts at regional scale (induced impacts)Road network development √ 2 2 √ 2 4 √ 3 1 √ 1 3 √ 3 -2 √ √ -1 -3Roadside development √ 2 2 √ 2 4 √ 3 1 √ 1 3 √ 3 -2 √ √ -1 -3Industrialization √ 2 2 √ 2 4 √ 3 1 √ 1 3 √ 3 -2 √ √ -1 -3Railway network development √ 2 2 √ 2 4 √ 3 1 √ 1 3 √ 3 -2 √ √ -1 -3<strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>Final Report (Environmental Action Plan)Environmental Impact Assessment ReportApril 30, 2010A4.2-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!