12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the impacts to be monitored, and when and where monitoring activities will be carried out, andwho will carry them out. In addition, EMMP also provides the cost associated to eachmitigation and monitoring measures.Chapter 9 - Institutional Arrangements and Capacity Development: This chapter covers theprofile of the key institutions responsible for the EMMP, allocation of responsibilities forimplementation of EMMP, existing capacity of the BBA in environment, recommendation toform a new safeguard department, training needs and capacity development of the unit andinstitutional framework for implementing the EMMP.Chapter 10 - Public Consultations and Information Disclosure: Covers the process of variousconsultations during the scoping, scheme design and detailed design stages. Also covers thedetails of the consultation meetings, comments received and incorporated in the detaileddesign and public disclosure of the EIA outcome.Chapter 11 - Economic Assessment: This chapter includes costs of mitigation and monitoring,capacity development costs, and benefits of environmental impacts.Chapter 12 - Conclusions and Way Forward: The chapter provides the summary of allfindings, issues addressed and concluding remarks on the future EIA and EMP requirements.1-29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!