12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

45. BBA will be responsible to coordinate with the Consultant to carry out the EIA studyalong with EMP in accordance with environmental guidelines of co-financiers and GOBwithin the project stipulated time schedule. The Environmental Unit of BBA will monitor theEIA and EMP activities on a regular basis and review all environmental reports preparedby the Environmental Team of the Consultant. MOE will be consulted for complex issuesand approval of environmental documents prepared by the Consultant.46. The Consultant will coordinate with the Panel of Experts regarding ImportantEnvironmental Components and other relevant issues during the course of the EIA study.7.0 Work Program and Personnel Schedule47. The duration of the preparation of the EIA including EMP will be about 14 months.The work program and personnel schedule is provided in Figure 1.A1-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!