AspectOperationalFrameworkofMonitoring andDisclosureWorld Bank ADB JICA GOB Harmonized OperationalFramework For Category A projectsthat are highly risky orcontentious or thatinvolve serious andmultidimensionalenvironmentalconcerns, the borrowershould normally alsoengage an advisorypanel of independent,internationallyrecognizedenvironmentalspecialists to advise onall aspects of the projectrelevant to the EA The borrower reports on‐ compliance withmeasures agreedwith the Bank on thebasis of the findingsand results of theEA, includingimplementation ofany EMP, as set outin the projectdocuments;‐ status of mitigatorymeasures; andfindings of monitoringprogramspreparation andimplementation ofprojects are used. Monitoring theeffectiveness of EMPimplementation Documentation ofmonitoring results,including developmentand implementation ofcorrective actions Disclosure of periodicprogress reportsthird party, composedof external experts withthe necessaryknowledge Discussions by theadvisory council areopen to the public <strong>Project</strong> plans includesfeasible monitoringplans that includesmonitoring of -unforeseeablesituations, performanceand the effectiveness ofmitigation measures. It is desirable thatproject proponentsmake the results of themonitoring processavailable to project localstakeholders.EIA Guidelines forIndustrial <strong>Project</strong>srecommend preparationof a Post-<strong>Project</strong>Monitoring Programme.This programme is to beincluded in the EIA reportand on review getsreflected as a condition ingranting ECC.There is a process ofrenewable of ECC thatrequires monitoring andassessment.DOE has theresponsibility of follow upand monitoring of ECC Compliance withmeasures agreed with theBank on the basis of thefindings and results of theEA, includingimplementation of anyEMP, as set out in theproject documents; Status of mitigatorymeasures; and findings ofmonitoring programs Monitoring theeffectiveness of EMPimplementation Documentation ofmonitoring results,including development andimplementation ofcorrective actionsA1-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!