12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Public Consultation with Affected Population, Local Government Bodies, PublicRepresentatives, NGOs and Business Communities to introduce the project components andanticipated impacts.EIA ProcessReview PreviousStudiesHarmonized EA RequirementsPublic ParticipationExpert Consultations(scientific community anddecision makers )Public ConsultationSCOPINGDefine direct, induced, andassociated componentsDevelop TOR for full EIABaseline EQM SurveyStudy StageInception StageFGDs with affectedcommunityScreening and PrioritizationInt. Scheme DesignEngineering Team of DC, POE,BBA Advisors, CFs, GOBExperience of Jamuna andother Major <strong>Bridge</strong> <strong>Project</strong>PREDICTION ANDMITIGATIONIdentify Impacts/RisksPropose Design Changesand Mitigation MeasuresFinal SchemeDesignPresent Draft EIA duringPublic ConsultationsDraft EIA Reports,EMP, and CEMPDetailed DesignReviewdraft EIA byPOE, CFs,GOBYesApprovalby DOEYesUpdated EIAReports, EMP, andCEMPFinal EIA Reports,EMP, and CEMPAudit,Assess EIAProcessMANAGEMENT ANDMONITORINGImplement EMMPProvide feedback forfuture EAs and CEMPImplement CEMPImplementationOperation andMaintenanceFigure 1-4: Methods of Environmental Assessment Preparation.Prediction of Impacts and Prepare Mitigation Measures by Field Investigation, Data Analysis,and Mathematical Modeling.Integration of environment with engineer’s planning and social concerns.1-26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!