<strong>Project</strong>Final SchemeComponentUSD million4. Land Acquisition & Resettlement & EMP cost 2105. Physical Contingency 85.96. Duty Tax (VAT etc) 155.3Total <strong>Project</strong> Cost 2,419.1Total Construction Cost2,158.1(including contingency & Duty VAT)Source: <strong>Project</strong> Cost Estimate Report, <strong>Padma</strong> <strong>Multipurpose</strong> <strong>Bridge</strong> Design <strong>Project</strong>, 8 April 201011.2.2 Environmental Costs5. The <strong>Project</strong> cost estimates in Table 11-1 also includes all environmental costs proposed in EIAreport, such as environmental mitigation and monitoring costs, environmental enhancement measuresand institutional strengthening. Details of these environmental costs are given in Table 11-2. The tablealso includes costs of community environmental management plan (CEMP) proposed for 4resettlement sites.Table 11-2: Environmental Costs included in the total <strong>Project</strong> costsS.ItemNo.1 EnvironmentalManagement andMitigation Plan of EIA2 Compensation andEnhancement Plans3 Institutional Strengtheningand CapacityDevelopment; andSupervision ofImplementation of EMMP4 Operational Budget forEMMP5 Environmental MonitoringPlan of EIADetailsCosts of mitigation measures duringconstruction and operation stagesproposed in EMMP (Refer Item AI Table8.3 of Chapter 8)Tree plantation and greenbeltdevelopment plan, conservation plans forprotected sanctuary, and visitor center(refer section 8.8 of Chapter 8) includingO&M Budget(i) Institutional Strengthening and EMMPImplementation Consultants; (ii) CapacityBuilding in Environmental Managementand Monitoring; (iii) Other NationalTraining Programs International TrainingPrograms; (iv) Third Party Arrangements;(v) Hardware and Software for GIS/MIS;(vi) Library Filming/Media/Publicity of<strong>Project</strong> Activities and (vii) Surveys,Analysis and Reports (refer Chapter 9)Maintenance of plantations, emergencyresponse plan, maintenance of protectedsanctuary, operation of visitor center, O/Mof hydrometeorological station, O/M ofCEMP (Refer Item B Table 8.3 of Chapter8)Costs of monitoring wildlife, air, noise,vibration and water quality in accordancewith EMMP during construction and O/M(Refer Item A and B of Table 8.4 ofChapter 8)Cost(US$ million)5.942.735.293.740.89Total 18.5911-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!