12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Daily Ittefaq, Dhaka, July 10, 2009 Daily Star, Dhaka, July 11, 2009 Rudra Barta, Shariatpur, July 10, 2009‣ PMBP Draft EIA Stage Daily Star, Dhaka, March 6, 2010 Prothom Alo, Dhaka, March 6, 2010 Rudra Barta, Shariatpur, March 5, 2010Figure 10-2: Locations showing various consultation meetings10.1.3 Overview of the Consultation Meetings5. The expert consultations were held in Dhaka during March-June 2009 and will continue throughoutthe <strong>Project</strong>. Fourteen FGDs were held or planned in various locations (6 at the resettlement sites, twoon the Charland, two at RTW alignments, two at service areas, and two at construction yards) duringApril to September and will continue throughout the <strong>Project</strong>. The first public consultations were held atMawa, Naodoba, and Bakhorerkandi during July 20-22, 2009. The second public consultations wereheld at Jashaldia, Kumarbhog, Naodoba, Bakhorerkandi and Kathalbari Char during March 16-19,2010. Figure 10-2 shows the locations of various consultation meetings and FGDs held in the <strong>Project</strong>area. The outcomes of the consultations and discussions were positive, with participants convinced10-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!