12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

In the event that any disagreement arise between the design consultants and thechecking engineer regarding a matter relating to the acceptability or suitability of thedesign, the design criteria or any other matter that cannot be easily resolved betweenthem, the POE may be asked by BBA to review the issues in question and provide anindependent opinion on the matter to help the design consultant and checking engineerreach agreement.9.1.6 Construction Supervision Consultants19. PIU will hire a construction supervision consultant (CSC) for supervision of implementation of civilworks, including supervision and implementation of EMMP. The CSC will consist of an environmentalunit with 3 international and 5 national environmental experts. The proposed positions and man monthrequirements of environmental specialists of the CSC are given in Table 9-1. The terms of referencefor the environmental consultants of CSC are given in Annex 9-3. Environmental specialists of CSC,in coordination with EU staff, will ensure the implementation of environmental management practicesat each stage of the project activities. The CSC will also be responsible for updating EMMP, ifrequired.Table 9-1: Proposed Environmental Specialists for CSCSl. No Expertise Input (PM)A International Consultants1 Unit Leader/Environmental Specialist 1 182 Environmental Specialist 2 243Environmental Specialist (Dredging andRTW) 324Subtotal (A) 66B National Consultants1 Environmental Specialists/Engineers (2) 722 Ecologist 243 Environment, Health, and Safety Specialist 364 Community Environmental Specialist 245 Field Surveyors (3) 108Subtotal (B) 264Total (A+B) 3309.1.7 External Monitor20. Besides internal monitoring and evaluation by the PIU/BBA for environmental management andmonitoring, independent external monitors will be retained by BBA, to undertake monitoring of all EAPand Non AAP components. These external monitors will carry out monitoring implementation of thedifferent components and submit an independent monitoring and appraisal report to the PIU, BBA andto the Co-financiers.9.1.8 Contractor21. Each Contractor procured under this <strong>Project</strong> (especially the contractors for main bridge andRTW) will be recommended to be a compliant of ISO 14001 Environmental Management System(EMS) certification. Further conditions of compliancy for OHSAH 18000 (2007) related OccupationalHealth and Safety (OHS) and SA 8000 (Social Accountability) could also be imposed on theContractors. Each contractor will be recommended to have one Environmental Specialist and oneOccupational, Health and Safety (OH) Specialist, who will be working in close coordination with theenvironmental staff of CSC and PIU.9.1.9 Other Relevant Organizations22. The other relevant organizations involved in the implementation of EMMP are those mentioned inthe Annex 9-1. Department of Environment (DOE) oversee implementation of all development projects9-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!