9.1.3 <strong>Project</strong> Implementation Unit10. A <strong>Project</strong> Implementation Unit (PIU) for <strong>Padma</strong> <strong>Project</strong> has been established as an ad hoc officeto manage the preparation (and subsequently implementation) of the proposed <strong>Padma</strong> bridge. Thestructure of the office follows the model for the Jamuna <strong>Bridge</strong> project office. The <strong>Padma</strong> <strong>Project</strong>office has 4 units, (i) <strong>Bridge</strong>s and Roads, (ii) RTW, (iii) Resettlement, and (iv) Environment. PIU isheaded by the <strong>Project</strong> Director.11. Organizational structure of PIU is shown in Figure 9-1.<strong>Project</strong>ImplementationUnit<strong>Project</strong> DirectorEnvironment UnitAdditional Director(Environment)Md. Selim RezaResettlement UnitSuperintending EngineerExecutive Engineer(Environment)Md. IqbalDeputy Director(Resettlement)2 X ExecutiveEngineers(Resettlement)Sr. Assistant Engineer(Environment)Md. Shoriful Islam Sarkar(Additional Charge)AssistantDirector(Resettlement)2 X SeniorAsstantEngineersSub-AssistantEngineer(Environment)Md. Humayn KobirAssistant Engineer(Environment)Vacant2 X Surveyors3 X AssistantEngineers(Resettlement)Assistant Director(Environment)Vacant2 X Sub-AssistantEngineersSupervisor(Site 1)VacantSupervisor(Site 2)VacantFigure 9-1: Organogram of PIU and EU12. Main tasks of the EU include:Planning and implementation of EMMPPreparation of TOR for studies to be carried out under EMMPSelection of consultants, NGOs for different components of EMMP implementation,including environmental enhancement plans9-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!