12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table of Contents9 Institutional Arrangements and Capacity Development 9-29.1 Profile of Key Institutions 9-29.1.1 Bangladesh <strong>Bridge</strong> Authority (BBA) 9-29.1.2 Need for Institutional Strengthening of BBA 9-29.1.3 <strong>Project</strong> Implementation Unit 9-39.2 Proposed Institutional Strengthening of PIU 9-89.2.1 Step A: Creation of a Safeguard Department 9-89.2.1.1 Manager Safeguard (Environment and Resettlement) Department 9-109.2.1.2 Environmental Engineer 9-109.2.1.3 Environment, Health, and Safety Specialist 9-109.2.1.4 Senior Resettlement Specialist (Field Operations)- 2 Positions 9-119.2.1.5 Senior Resettlement Specialist (Management and Monitoring) 9-119.2.1.6 Budget for Establishment of SD 9-119.2.2 Step B: Association with Twining Institutions 9-119.2.3 Step C: Capacity Building Programs 9-119.2.4 Step D: Third Party Engagements 9-129.2.5 Step E: Formation of a Grievance Redress Committee 9-139.2.6 Step F: Establishment of Environmental Management System 9-149.2.7 Step G: Establishment of GIS and MIS 9-159.3 Cost Estimates for Institutional Strengthening 9-159.4 Institutional Framework for Implementing EMMP 9-15AnnexureAnnex 9-1: Roles and Responsibilities of Various Agencies involved in EMMP ImplementationAnnex 9- 2: Environmental Management Committee of PIU, BBAAnnex 9- 3: TOR for Consulting Services for Environmental Consultants of CSCAnnex 9- 4: Sample Memorandum of UnderstandingAnnex 9-5: Outline Terms of Reference for Consulting Services For Capacity Building InEnvironmental Management And MonitoringAnnex 9-6: Framework for the Establishment of an Environmental Management SystemList of TablesTable 9-1: Proposed Environmental Specialists for CSC 9-7Table 9-2: Proposed Budget for Establishment of Safeguard Department 9-11Table 9-3: Proposed Budget for Establishment of GIS/MIS 9-15Table 9-4: Proposed Budget for Institutional Strengthening and Capacity Building of BBA 9-15List of FiguresFigure 9-1: Organogram of PIU and EU 9-3Figure 9-2: Proposed Organization Chart of BBA 9-9Figure 9-3: Proposed Institutional Framework for EMMP Implementation 9-169-i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!