12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Parameter Location Means of Monitoring Frequency Responsible AgencyImplemented By Supervised Bybe performed once in a year. Oncerecognized laboratorythe remote sensing image of thatyear become available,classification of the ecosystems willbe done. Ecosystems found fromthe images will be visited and aspecies assessment will be madeas described in the design phase.Faunal Monitoring In the <strong>Project</strong> are Similar to construction phasemonitoring of faunal resources willbe performed once in a year at thepost-construction period. Faunalresource survey will coincide withfloral resource survey as it willprovide more insight about theinter-dependency between floraand fauna in an ecosystem.YearlyBBA through nationallyrecognized laboratoryExternal MonitorGangeticmonitoringDolphinWithin 2 km bufferarea from bridgelocationPart of the faunal monitoringGangetic Dolphin will also bemonitored once in a year. Countingnumber, occurrence assessment,and presence of infants will bemonitored within 2 km buffer areafrom bridge location.YearlyBBA through nationallyrecognized laboratoryExternal MonitorHilsa migration In the <strong>Project</strong> area Monitoring of Hilsa will beconducted using similar methodfollowed in the design phase tomake sure that the results can becomparable. Catch assessmentsurvey/occurrence, Length-weightanalysis, Age analysis will be usedto monitor Hilsa migration in theYearlyBBA through nationallyrecognized laboratoryExternal Monitor8-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!