12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong>ActivitiesEnvironmentalImpactsMitigation/Compensation MeasuresBudget,USDInstitutionalResponsibilitiesImplementationSupervisionchanges development and provision of cross-drainage structures and treatment of industrialcoordinationrapid change in land effluents prior to disposal of wastes into lands/water bodies;with theuse Prohibit roadside waste dumpingrelevant Landuse zones should be established supported by good landuse policyguideline and regular monitoring.governmentagenciesBuilt-up/semiurbanWildlife adaptation to Monitoring of wildlife on Charland,NGOs BBAnature changed environment Monitoring of wild life status post constructionof environment formulation of appropriate strategy for conservation and securing wildlifeNote: BBA – Bangladesh <strong>Bridge</strong> Authority, BR – Bangladesh Railway; BIWTA – Bangladesh Inland Water Transport Authority; CSC – Construction Supervision Consultant;DOE – Department of Environment; EU – Environmental Unit; FD: Forest Department; LGED : Local Engineering Government Department; NGOs – Non GovernmentOrganizations; PIU – <strong>Project</strong> Implementation Unit, PPE – Personal Protective Equipment; RHD – Roads and Highway Department;8-24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!