12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong>ActivitiesEnvironmentalImpactsdrums- Handling ofbitumenImpact on TrafficsafetyMitigation/Compensation MeasuresCareful management of any petroleum products used in the preparationof the bitumen mixture to avoid spills and contamination of the localwater table.Implement ECP 15 on Traffic Management and Road Safety.Control speed of construction vehicles through road safety educationand fines.Allow adequate traffic flow around construction areas.Provide adequate signage, barriers and flag persons for traffic control.Budget,USDIncluded incivil workscontractInstitutionalResponsibilitiesImplementationSupervisionContractor CSC, PIUTraffic jams andcongestionsCommunicate to the public through community consultation andnewspaper announcements regarding the scope and schedule ofconstruction, as well as certain construction activities causingdisruptions or access restrictions.Implement ECP 15 on Traffic Management and Road Safety.Included incivil workscontractContractorCSC, PIU4. <strong>Bridge</strong> End FacilitiesSite ClearanceandpreparationLoss of 204,585m 3top soilsLoss of 4,943 treesand 89 ha ofagriculture lands5. Construction CampsEstablishment Lack of properof camps services in campssuch as safe drinkingMaintenanceof campswater and sanitation.Contamination fromsolid wasteCollect/strip top soil before earth-filling and store and re-use it for finalsurfacing of railway embankment and tree plantationTree plantation to compensate the lost trees and agriculture promotionactivitiesProvision of necessary facilities in construction camps as given in ECP17 on Construction Camp Management. Implement waste management activities as given in ECP 17 onConstruction Camp Management All construction materials will be reused, recycled and properly disposedof. All worn out parts, equipment and empty containers must beremoved from the site to a proper storage location designated by BBA. There will be no site-specific landfills established by the contractors. Allsolid waste will be collected and removed from the work camps anddisposed in local waste disposal sites.Included incivil workscontractincluded inPlantationbudgetIncluded incivil worksIncluded incivil worksContractorContractorContractorContractorCSC, PIUCSC, PIUCSC, PIU,ExternalMonitorCSC, PIU,ExternalMonitor8-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!