12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong>ActivitiesEnvironmentalImpactsconditionsConstruction yardofmaintainedWater all plants regularlyMitigation/Compensation MeasuresBudget,USDPlantationbudgetInstitutionalResponsibilitiesImplementationSupervisionII. CONSTRUCTION STAGE1. Main <strong>Bridge</strong>Largequantities ofmaterial ImportDredging foraccess/transitchannel andbargemovementMobilization ofequipment andMaterialsthrough roadExploration of illegalsourceLocal turbidity atcutter headsLoss of wildlife andaquatic habitatRoad Safety andTraffic ManagementEnvironmental permits of suppliers from relevant authorityDredging takes place below the surrounding riverbedCompensation by establishment of <strong>Padma</strong> protected sanctuaryEstablishment of Charland Visitor Center Implement ECP 15 on Road Transport andRoad Safety Management. Ensure that all construction vehicles observe speed limits on theconstruction sites and on public roads Provide adequate signage, barriers, and flag persons for traffic control. Fit audible warning devices in all vehicles to alert during reversing.Included incivil workscontractIncluded incivil workscontract$1,350,000$430,000Included incivil workscontractContractorContractorContractorContractorPIUCSCPIUCSC, PIU,LocalGovernments, PoliceDamage of localroads due tomovement of heavyaxle loads Maintain all existing roads in traffic worthy condition ensuringmaintenance of uninterrupted movement of traffic. Temporary bypasses to be constructed and maintained (including dustcontrol) during the construction period particularly at bridge crossings. Form a grievance redress committee in association with affectedpopulation before starting the civil work and advance notice must begiven to the community about the construction schedule. Repair the damaged local roads to their original condition after projectcompletion.Included inCivil WorksContractorCSC, PIU,LGED8-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!