Table 8-1: Environmental Management and Monitoring Plan<strong>Project</strong>ActivitiesEnvironmentalImpactsI. PRE-CONSTRUCTION STAGE1. Land Acquisition and ResettlementAcquisition of about LandAcquisition1,144 ha land forthe project.Requisition of about81 ha land on atemporary basis(for about 6 years)Mitigation/Compensation MeasuresProvide compensation in accordance with ‘resettlement action plans’(RAPs)Engage NGOs for implementation of RAPEstablish Monitoring Unit involving 3 parties (BBA, co-financiers andPAPs) for monitoring purposesBudget,USDUS$208million(Included inRAPs)InstitutionalResponsibilitiesImplementationDC/BBA/INGOSupervisionNGO/ExternalMonitorLandAcquisition forPCRsImpact on Culturaland religioussensitivity of thecommunity Design to avoid the mosque/ mazaar by adjusting the approach road andrail road viaducts. If , it has to be relocated then, Compensate as per assessed by DC Undertake community consultation to determine all relocationarrangements Coordinate site selection, design and estimate, site development andreconstruction in consultation with authorized representative of themosque/community Associated facilities such as power, water supply etc. will be provided atthe new mosqueUS$73,529(Included inRAP)DC,BBAPIU,Representative fromcommunity,ExternalMonitorAgricultureProductionLossAgricultural landloss (about 764 ha)Demonstrate measures for changing cropping pattern to compensate theloss of crop production including development of demonstrating plotsProvide training program for the farmers and technical support to themBring fallow lands under agricultural cultivation1,000,000USD(Included inRAP)PIU, NGOsBBA, DAEResettlement 4,975 householdswill be affectedthrough loss ofstructures(housing,business andother structures)Establish 4 Resettlement Sites (RS) for PAPs with basic infrastructurefacilities such as roads, drains, water supply, garbage disposal site,sanitation, school, mosque, health centre, market, play ground, powersupply, and greenbelts.Accommodate 1,944 households in Resettlement sitesCreate job opportunities for those who lost employments due to landacquisition in the construction and post construction O/MUS$62.3million (Ref.RAPs)PIU, INGO,NGOsCSC, PIU8-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!