12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table of Contents8 Environmental Management and Monitoring Plan 8-38.1 Guiding Principles of EMMP 8-38.1.1 Methodology 8-38.1.2 Mitigation/Protection/Compensation Measures 8-48.1.2.1 Avoidance/Prevention 8-48.1.2.2 Modification 8-48.1.2.3 Control/Mitigation 8-58.1.2.4 Protection/Insulation 8-58.1.2.5 Relocation/Compensation 8-58.1.2.6 Enhancement 8-58.1.3 Monitoring Mechanism 8-58.1.4 Budget Estimates 8-68.1.5 Institutional Framework for Implementation of EMMP 8-68.2 Management of <strong>Project</strong> related Impacts 8-78.3 Environmental Code of Practices (ECP) 8-88.4 Resettlement Action Plan 8-338.5 Dredge Material Management Plan 8-358.6 Emergency Response Plan 8-408.7 Addressing Associated and Regional Scale Impacts 8-408.8 Adaptation of EMMP during Implementation 8-408.9 Compensation and Environmental Enhancement Plans 8-418.10 Hydro-meteorological Monitoring Station 8-568.11 Environment Enhancement Fund 8-57AnnexureAnnex 8 1: Environmental Code of PracticesAnnex 8 2: <strong>Project</strong> Entitlement MatrixAnnex 8 3: Emergency Response PlanList of TablesTable 8-1: Environmental Management and Monitoring Plan 8-9Table 8-2: Environmental Monitoring Plan during Construction and Operation 8-25Table 8-3: Summary of Costs of EMP during Construction and O/M 8-32Table 8-4: Summary of Costs for Monitoring during Construction and O/M 8-33Table 8-5: Dredge Material Requirement for Filling up of <strong>Project</strong> Sites 8-36Table 8-6: Proposed budget for dredge material management plan 8-40Table 8-7: Locations and Details of Resettlement Sites 8-41Table 8-8: Details of Proposed Plantation in the <strong>Project</strong> Sites 8-45Table 8-9: Cost Estimates for Tree Plantation Plan 8-46Table 8-10: Budget for Wildlife Baseline Establishment and Monitoring 8-52Table 8-11: Estimated budget for the Protected Sanctuary in <strong>Padma</strong> 8-52Table 8-12: Cost of Visitor Centre at Mawa 8-52Table 8-13: Details of Anticipated Income & Livelihood Restoration Options for AH 8-56Table 8-14: Budget for Establishment of Hydro-meteorological Station 8-57Table 8-15: <strong>Project</strong>ed Revenues Collections from Toll and EEF 8-58List of FiguresFigure 8-1: Framework for Preparation of EMMP during Construction and O/M 8-38-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!