Figure 6-4: Alternative 2: Guide bund and hard points on bank of south channel6.6.3 Alternative 2 Modified – Hard points in Char:32. Alternative 2 Modified is an optimization of Alternative 2 by shifting of the two hard points acrossthe south channel on the char, while the guide bund at the main bridge is unchanged from Alternative2 (Figure 6-5). The hard points need to be connected to the approach road along the south bank bycross dams in order to prevent flow passing behind the structures. Therefore existing side channel andflood plain would be permanently blocked.Figure 6-5: Alternative 2 Modified: Guidebund and hardpoints on char6-21