12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. The main components of the <strong>Project</strong> are shown in Figure 1-2. More detail information on the<strong>Project</strong> components is given in Chapter 2.7. There are some components associated with the <strong>Project</strong>, which require further assessments like;widening of Dhaka-Mawa Highway from two to four-lanes, establishment of railway network fromGendaria-Mawa through the bridge to Bhanga-Kashiani-Narail-Jessore, and bypass Road in Group Bdevelopment area of Rajuk (Capital City Development Authority). Implementation of these componentsmay take place over a period of time. To draw full benefits of the <strong>Padma</strong> <strong>Bridge</strong> project,implementation of these components will be necessary. A general assessment is made since thecorrect alignment is not known at this stage.1.1.4 <strong>Project</strong> Financing8. The detailed cost estimate of the project is done during scheme design; the current estimate isabout US$2.4 billion (Table 1-1). GoB has been in discussion with various co-financiers to participatein the investment of the <strong>Project</strong>. A number of co-financers has already showed interest and extendedtheir commitments. These co-financiers include the Asian Development Bank (ADB), the World Bank(WB), the Japan International Cooperation Agency (JICA), and the Islamic Development Bank (IDB).In addition to the Co-financiers, GoB will also contribute in the implementation of the <strong>Project</strong>.Table 1-1: Estimated <strong>Project</strong> Cost a<strong>Project</strong>Final SchemeComponentUSD million1. Construction CostMain <strong>Bridge</strong>907.5 bServices on the Main <strong>Bridge</strong> 41.4Approach Roads 131.6Road Viaducts 60.5Rail Viaducts 7.8Rail facilities 36.8<strong>Bridge</strong> End Facilities 68.3River Training Works 597.4Ferry Route Adjustment 8.0Construction Yard 57.5Total Construction Cost 1916.82. Engineering CostConstruction Supervision46.4 c3. Administration CostConstruction supervision - 10% Construction Supervision 4.64. Land Acquisition & Resettlement & EMP cost 2105. Physical Contingency 85.9 d6. Duty Tax (VAT etc) 155.3 eTotal <strong>Project</strong> Cost 2,419Source: <strong>Project</strong> Cost Estimate, April 8, 2010Notes:a Cost will be updated once again after the engineers’s estimateb Includes contractor on‐costs for site overheads, supervision and margin (estimated at 11.57% of construction cost)c estimated at 3% of the construction cost excluding contractor on‐costsd estimated at 5.0% of the construction cost excluding contractor on‐costse estimated at 14.5% of the cost of imported items1.1.5 Present Stage of <strong>Project</strong> Preparation9. The <strong>Project</strong> is now in its detailed design stage. In the process of detailed design, variousalternatives have been reviewed to arrive at the preferred project design. In arriving at the preferred1-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!