12.07.2015 Views

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

Padma Multipurpose Bridge Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Income Madaripur Shariatpur Munshiganj(000 Tk.) No. % No. % No. % No. %Up to 10 23 7.90 39 9.80 25 5.04 87 7.310-20 102 35.05 99 24.87 107 21.57 308 26.020-30 57 19.59 97 24.37 111 22.38 265 22.430-50 56 19.24 77 19.35 112 22.58 245 20.750-75 22 7.56 42 10.55 61 12.30 125 10.575+ 31 10.65 44 11.06 80 16.13 155 13.0Total 291 100 398 100 496 100 1185 100Average 37,563 40,378 49,116 43,084incomeSource: BIDS Census Survey, 20093.4.3 Land Acquisition102. The <strong>Project</strong> requires acquisition and or requisition of land for the construction of the variouscomponents of the <strong>Project</strong>. A summary of the land acquisition is presented in Table 3-39. The totalland area to be acquired for various components in the mainland is about 1,144 ha, of which 842.8 ha(about 73.7%) is on the South bank (Shariatpur and Madaripur districts). In addition, there will beacquisition of about 190ha Charland for the transit/access channel and maneuvering of barge andcranes. Over half of the land to be acquired in the mainland would be for river training works along theriverbank with limited physical displacement, followed by approach road and service area. Therequisition of land for the construction yard in Janjira will be for six years on a rental basis (78ha).Table 3-39: Total Area of land (ha) to be acquired permanently for the <strong>Project</strong><strong>Project</strong> Agriculture Homestead Water bodies Others TotalComponents(Garden,Fallow &Charland)Mawa SideRS 28.7 0.47 0.46 0.63 30.26Main <strong>Bridge</strong> 0 0 0 0 0Service Area 27.03 0 0 0 27.03Approach Road 36.23 9.66 1.44 0.97 48.3including TollPlaza and RailRTWs* 55.74 58.35 0.62 114.72Construction 0 0 0 81.00 81.00Yard (CY1)Subtotal: 301.31Janjira SideRS 33.64 0.98 0.98 2.80 38.40Main <strong>Bridge</strong> 190 190Service Area 61.6 0 2.10 63.7Approach Road 124.12 23.27 4.63 4.65 156.67including TollPlaza and RailRTWs* 272.31 42.93 1.77 77 394.03Subtotal: 842.8Total: 1,144.11Notes:(1) Land for CY2=78ha at Janjira Side will be requisitioned for 6 years(2) Area of the Janjira service area shown in RAPII 148.5ha, this includes FS acquisition also.(3) Consultant’s Survey during May 2009‐ April 2010.(4) *Based on feasibility estimates as LA survey for RTWs area not yet completed.3-60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!