12.07.2015 Views

crawler crane - Hitachi Construction Machinery

crawler crane - Hitachi Construction Machinery

crawler crane - Hitachi Construction Machinery

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TECHNICAL DATA•STANDARD EQUIPMENTBASIC MACHINEUndercarriage• Crawler-type undercarriage (with 760 mm shoes)Superstructure• Front lights (2 pcs)• Rearview mirrors (left and right)• Centralized lubrication system (for gantry and swing circle)• Electric refuel deviceCab• Sunvisor• Floor mat• Room light• Cigarette lighterSafety Devices• Swing lock• Drum pawl lock (main and auxiliary hoist, and boom hoist)• Swing alarm• Under-cover (at cab and superstructure bottom)• Cab entrance steps• 8.8 ton counterweight• Standard tool kit• Ashtray• AM radio• Before-work check monitorFRONT ATTACHMENTSCrane• 10 m basic boom (lower 5.0 m, upper 5.0 m)• Boom back stop• Boom angle indicator• 30 ton hook• Main hoist rope (φ22 mm × 130 m)Clamshell• 10 m basic boom (lower 5.0 m, upper 5.0 m)• Boom back stop• Boom angle indicator• Open/close and suspend rope disengagement preventiondevice• Open/close rope (φ22 mm × 67 m)*Dragline• 10 m basic boom [Lower 5.0 m, upper 5.0 m and wide-anglesheaves (with 1 boom-point sheave) ]• Boom back stop• Boom angle indicator• Hoist rope (φ22 mm × 50 m)• Boom hoist rope (φ14 mm × 130 m)• Moment limiter• Overhoist prevention devices(main hook, boom hoist, secondary)• Suspend rope (φ22 mm × 60 m)*• Hydraulic tagline with φ10 mm × 45 m rope• Boom hoist rope (φ14 mm × 130 m)* Open/close and suspend ropes are determined based on 19 m boomlength and 12 m digging depth.• Drag rope (φ22 mm × 34 m)• Boom hoist rope (φ14 mm × 130 m)• Fair-lead• Overhoist prevention device(for boom hoist and secondary hoist)14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!