12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. AMERICAN WELDING SOCIETY (AWS) STANDARD.FTWIC-2235June, 2009AWS D1.1AWS B1.10AWS A5.1AWS A5.5Structural Welding Code - SteelGuide for Non-Destructive Inspection of WeldsSpecification for Mild Steel Covered Arc Welding ElectrodesSpecification for Low Alloy Steel Covered Arc WeldingElectrodesG. STEEL STRUCTURES PAINTING COUNCIL (SSPC) PUBLICATIONS:Steel Structures Painting Manual, Volume 21.06 DELIVERY AND STORAGE:Ship expansion joints to site in protective cartons.1.07 JOB CONDITIONS:A. <strong>Contract</strong>or shall verify all dimensions and shall take all field measurements necessary toestablish size and connections prior to fabrication. Provide any anchors, brackets,supports, braces, connections and fasteners necessary to assemble the variouscomponents and anchor into position into the structure.B. Holes for bolts and screws shall be drilled or punched. Mismatched holes will not beallowed. Fasteners shall be concealed wherever possible. Exposed fasteners shall be ofcompatible materials and shall match color and finish of surrounding materials.C. Each component shall be of adequate size and strength necessary to fulfill its function.Failure of any part of the assembly is cause to reject the entire component. Componentshall be assembled in a neat and substantial manner. Joints exposed to the weather shallbe formed in a manner to exclude water.D. Items noted to be galvanized shall be hot dipped processed after fabrication. Galvanizingshall conform to the requirements of ASTM A-123, A-306, or A-525, as applicable. Inaddition to specific items shown or specified to be galvanized, galvanize items of thiswork which are fabricated of ferrous metal and exposed on or outside of the exteriorsurfaces of the building above or below grade. Galvanize after fabrication. Take properprecautions to prevent warping of the metal. Straighten any item that does becomewarped.E. Provide miscellaneous plates, brackets, frames, anchors and other steel fabrications asindicated on the drawings or required to make connections to components furnishedunder other sections of the <strong>specifications</strong>. Provide brackets for elevators and rails,precast concrete panels, and frames for mechanical equipment.05500-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!