12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June, 2009D. Take precautions during excavation procedures to guard against damage to activeunderground piping. In the event that inactive or abandoned pipelines are uncovered,determine that the lines are inactive, then remove buried piping within the limits ofconstruction, or 4'-0" beyond the limits of buildings or other structures, or as needed toclear excavations. Plug both ends of such abandoned piping with concrete plugs.3.03 FIELD QUALITY CONTROL:Check the local regulations and consult with the Owner to determine whether burning will bepermitted on the site.END OF SECTION02100-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!