12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June, 2009C. EQUIPMENT WARRANTY TAGS AND GUARANTOR’S LOCAL REPRESENTATIVE:Furnish with each warranty the name, address, and telephone number of the guarantor's representativenearest to the location where the equipment and appliances are installed. The guarantor'srepresentative, upon request of the using service's representative, will honor the warranty during thewarranty period, and will provide the services prescribed by the terms of the warranty. At the time ofinstallation, tag each item of warranted equipment with a durable, oil- and water-resistant tagapproved by the <strong>Contract</strong>ing Officer. Attach tag with copper wire and spray with a clear siliconewaterproof coating. Leave the date of acceptance and inspector's signature blank until project isaccepted for beneficial occupancy. Tag shall show the following information:Type of Equipment/Product ____________________Warranty Period __________ From __________ To __________<strong>Contract</strong> No. ____________________Inspector's Signature ____________________ Date Accepted _______________Construction <strong>Contract</strong>or:Name: ____________________Address: _______________________Telephone: _______________________Warranty Contact: __________________Name: ____________________Address: ________________________Telephone: ________________________PART 3.00EXECUTION3.01 PRE-INSPECTION:The contractor shall perform an inspection of all the work prior to requesting a final inspection. Thecontractor shall provide a written list of deficiencies for each of their suppliers and subcontractors. Copiesof all lists shall be provided to the FAA COR.3.02 CLEAN-UP:After acceptance of work, the premises shall be cleaned a final time. Clean interior and exterior glasssurfaces; remove temporary labels, stains and foreign substances; polish transparent and glossy surfaces;vacuum carpeted and fabric surfaces. Clean equipment and fixtures to a sanitary condition. Replace filterson operating equipment. Clean debris from roofs, gutters, downspouts and drainage systems. Sweeppaved areas and rake clean landscaped areas. Remove waste and surplus materials, rubbish andconstruction facilities from the site.END OF SECTION01700-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!