12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FTWIC-2235June, 2009.For submittals which include proposed deviations requested by the <strong>Contract</strong>or, thecolumn "variation" of the transmittal form shall be checked. The <strong>Contract</strong>or shall setforth in writing the reason for any deviations and annotate such deviations on thesubmittal. The Government reserves the right to rescind inadvertent approval ofsubmittals containing unnoted deviations.3.05 CONTROL OF SUBMITTALS:The <strong>Contract</strong>or shall carefully control his procurement operations to ensure that each individualsubmittal is made on or before the <strong>Contract</strong>or scheduled submittal date shown on the approved"Submittal Register."3.06 GOVERNMENT APPROVED SUBMITTALS:Upon completion of review of submittals requiring Government approval, the submittals will beidentified as having received approval by being so stamped and dated.3.07 INFORMATION ONLY SUBMITTALS:Normally submittals for information only will not be returned. Approval of the <strong>Contract</strong>ingOfficer is not required on information only submittals. The Government reserves the right torequire the <strong>Contract</strong>or to resubmit any item found not to comply with the contract. This does notrelieve the <strong>Contract</strong>or from the obligation to furnish material conforming to the plans and<strong>specifications</strong>; will not prevent the <strong>Contract</strong>ing Officer from requiring removal and replacementof nonconforming material incorporated in the work; and does not relieve the <strong>Contract</strong>or of therequirement to furnish samples for testing by the Government laboratory or for check testing bythe Government in those instances where the technical <strong>specifications</strong> so prescribe.3.08 SCHEDULES:A. All submittals, including samples, certificates and shop drawings shall be submitted inample time for the Government to make a determination of compliance with specificationbefore fabrication or before materials are delivered to the site. All submittals requiringprior Government approval shall be submitted in advance of first need an amount of timeadequate to allow for FAA's review (30 calendar days maximum) from date of receiptwith possible contractor’s re-submittal (15 calendar days maximum) from date of receiptand FAA’s subsequent re-submittal review (15 calendar days maximum) from date ofreceipt. An additional (15 calendar days maximum) shall be allowed and shown on theregister for review and approval of submittals for [food service equipment] [and][refrigeration and HVAC control systems].B. After a submission has been approved, no substitutions will be permitted without prior written approval bythe <strong>Contract</strong>ing Officer.01300-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!