12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FTWIC-2235June, 2009.describe the work covered in the respective sections. Units of weights and measures used on allsubmittals shall be the same as those used in the contract drawings. Each submittal shall becomplete and in sufficient detail to allow ready determination of compliance with contractrequirements. Prior to submittal, all items shall be checked and approved by the <strong>Contract</strong>or andeach item shall be stamped, signed, and dated indicating action taken. Proposed deviations fromthe contract requirements shall be clearly identified. Submittals shall include items such as:<strong>Contract</strong>or's, manufacturer's, or fabricator's drawings; descriptive literature including (but notlimited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples;O&M manuals (including parts list); certifications; warranties; and other such requiredsubmittals. Submittals requiring Government approval shall be scheduled and made prior to theacquisition of the material or equipment covered thereby. Samples remaining upon completion ofthe work shall be picked up and disposed of in accordance with manufacturer's Material SafetyData Sheets (MSDS) and in compliance with existing laws and regulations.3.02 TRANSMITTAL FORM (submittal register) (ATTACHMENT NO. 1):At the end of this section is a copy of the register listing items of equipment and materials forwhich submittals are required by the <strong>specifications</strong>; this list may not be all inclusive andadditional submittals may be required. The <strong>Contract</strong>or will also be given the submittal register asa diskette containing the computerized form. The <strong>Contract</strong>or shall keep this diskette up-to-dateand shall submit it to the Government together with the monthly payment request. The approvedsubmittal register will become the scheduling document and will be used to control submittalsthroughout the life of the contract. The submittal register and the progress schedules shall becoordinated.The sample transmittal form shall be used for submitting both Government approved andinformation only submittals. This form shall be properly completed by filling out all the headingblank spaces and identifying each item submitted. Special care shall be exercised to ensure properlisting of the specification paragraph and/or sheet number of the contract drawings pertinent tothe data submitted for each item.3.03 RFI FORM (ATTACHMENT NO. 2):At the end of this section is a copy of the request for information (RFI) form. The <strong>Contract</strong>orshall use the approved RFI form for submitting RFI requests. All items on this form must becompleted by the <strong>Contract</strong>or before submitting the RFI. The Government has up to 30 days torespond to the RFI.3.04 SUBMITTAL PROCEDURE:Submittals shall be made as follows:A. PROCEDURES:The <strong>Contract</strong>or shall submit the required submittal to the FAA Resident Engineer or asotherwise designated.B. DEVIATIONS:01300-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!