12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June, 2009.1.04 SAMPLES:A. Submit samples where indicated in the specification as requested by the <strong>Contract</strong>ingOfficer. After review and approval by the <strong>Contract</strong>ing Officer, samples will be returnedand may be incorporated into the construction, except that samples that are to be used tojudge quality of work will be retained until the work has been completed and approved.B. Submit two (2) samples whenever samples are requested. Samples will be accompaniedby descriptive data, <strong>specifications</strong> and certificates where necessary.1.05 JOB CONDITIONS:A. Submittal data shall demonstrate that the proposed material and equipment is incompliance with the design criteria and the requirements of the <strong>Contract</strong> Documents.Submittals and shop drawings shall provide a record of the materials and equipmentincorporated into the project and shall provide information for maintenance and repairs.B. <strong>Contract</strong>or shall coordinate all shop drawings, and review for accuracy, completeness,and compliance with contract requirements and shall indicate its approval thereon asevidence of such coordination and review. The <strong>Contract</strong>or shall take complete andaccurate field measurements for any item which must fit to field conditions. Includethese dimensions on the submittals, indicating that the measurements represent actualdimensions obtained at the site.C. Any submittal that does not contain <strong>Contract</strong>or's approval stamp will be returned withoutprocessing. <strong>Contract</strong>or shall affix a rubber stamp to each submittal stating that he hasreviewed the submittal and included any necessary corrections, and is satisfied that thematerial contained therein is in compliance with the <strong>Contract</strong> Documents. <strong>Contract</strong>orshall affix to each submittal the project identification, the sheet number of the drawingwhich identifies the area which the shop drawing represents and the specificationparagraph identification where the item is specified. The stamp shall have the followinginformation:---------------------------------------------------------------Name of Project:<strong>Contract</strong> No.<strong>Contract</strong>or's Name.Project No.Submittal No.Drawing No. Spec. Ref.This shop drawing has been reviewed and determined to be in compliance with the<strong>Contract</strong> Documents, including Plans and Specifications, as modified by Addenda,Change Orders, and Field Orders as of the date of this submittal.<strong>Contract</strong>or's Signature:Date:---------------------------------------------------------------D. <strong>Contract</strong>or is responsible to coordinate the submittals between the various trades. Whena proposed component requires modification to some other part of the project, the<strong>Contract</strong>or shall also include the revision or modifications necessary to incorporate theproposed item.01300-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!