12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June 2009C. Make all electrical power grounding and control connections to equipment furnishedunder other divisions of the <strong>specifications</strong> and furnish wiring, conduit, outlet boxes,disconnect switches, etc., as required for same. Check General Construction, Controls,Plumbing, Heating and Air Conditioning, etc., plans and <strong>specifications</strong> to determine theamount of such wiring required and include cost of same in bid. Verify locations,horsepower, voltages, etc., of all equipment as the job progresses.D. Provide branch circuits and connections to all motors furnished to this project. Provideall disconnect switches as shown and where required by national or local codes. Ingeneral, all wiring shall be in conduit, with a short section of flexible conduit at eachmotor. Securely attach conduit to flexible conduit. When the motor is an integral part ofequipment, isolate with a short section of flexible conduit to prevent vibration and/ornoise amplification to the building structure. If the motor is adjustable, an additionallength of flexible metal conduit shall be installed at the motor. Connect a ground wirefrom the conduit termination to the motor frame on the inside of the flexible conduit.Use approved grounding lugs or clamps on the conduit connection.E. Branch circuits and connections to all electrically operated equipment are included in thiscontract, whether or not specifically mentioned. Check, on the job, for further details onPlumbing, Heating and Air Conditioning equipment as project progresses. Groundequipment in an approved manner.F. Major equipment furnished under the mechanical and other sections of the <strong>specifications</strong>may require different rough-in requirements than indicated on the plans due to thevariations in equipment by different manufacturers. Secure detailed drawings from thetrade furnishing the equipment to determine actual rough-in locations, conduit andconductor requirements.G. Before connecting equipment, check the nameplate data against the information shownon the drawings.END OF SECTION16122-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!