12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

.FTWIC-2235June 20093.08 FIELD QUALITY CONTROL:TESTING: Provide the tests as outlined hereinafter and other tests necessary to establish theadequacy, quality, safety, completed status and suitable operation of each system. Tests are to beconducted in the presence of the <strong>Contract</strong>ing Officer.A. The <strong>Contract</strong>or shall submit in writing to the <strong>Contract</strong>ing Officer the measured groundresistance of each new ground rod, immediately following the test, indicating the locationof the rod, resistance to ground, and the soil conditions at the time the measurementswere made. After all ground rods are installed, they shall then be tied together with thecounterpoise and the resistance to ground of the entire system shall be measured. Theabove tests shall be made with an earth resistance tester. Where additional ground rodsare required to achieve the specified resistance, the <strong>Contract</strong>ing Officer shall be notifiedbefore proceeding with additional work.B. The <strong>Contract</strong>ing Officer shall start the following final tests after complete preliminarytests have been made which indicate adequacy, quality, completion and satisfactoryoperation.1. The <strong>Contract</strong>or shall complete the form "Electrical Test Report," in sufficientquantity to provide the indicated information for each panelboard andswitchboard in the project.2. The <strong>Contract</strong>or shall complete the form "Motor Test Report," in sufficientquantity to provide the indicated information for each three phase motor in theproject.3. The <strong>Contract</strong>or shall submit a summary of the "Electrical Test Report" and"Motor Test Report," noting all deviations from requirements listed below:Plus or minus 5% variation between nominal system voltage and no-load voltage,or plus or minus 5% between no-load and full load voltage.Plus 5% variation between rated and actual motor current.Plus or minus 10% variation between average phase current and measuredindividual phase currents. The <strong>Contract</strong>or shall balance phase currents of alldistribution equipment within the tolerances specified.4. After the previous tests have been completed, the <strong>Contract</strong>or shall redistribute theloads where he finds greater than a 20% difference between readings in any twophases. If the <strong>Contract</strong>or finds any phase loaded above 80% of the rating of itsovercurrent protective device, he shall notify the <strong>Contract</strong>ing Officer.5. After installation of all branch circuits, the neutral in the service entrance switchshall be tested for isolation from ground with an ohmmeter set on its RX1 scale.The incoming neutral shall be temporarily disconnected to accomplish this test.Any contact between the neutral and ground (other than at the service entrance16010-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!