12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

.FTWIC-2235June 2009WW-C-581 Conduit, Metal Rigid and Intermediate; and Coupling, Elbow,and Nipple, Electrical Conduit: Zinc-CoatedWW-P-521 Pipe Fittings, Flange Fittings, and Flanges, Ferrous and Steel,(Screwed and Butt-Welded) 150 poundsWW-T-799 Tube, Copper, Seamless (for use with Colder Type or Flared-Tube Fittings)19. Military Specifications:MIL-S-12514Starter, Motor; Across-the-Line and Reduced VoltageTypes, AC Induction, 3/4 to 100 HP, Manual andMagneticMIL-R-21931 Resin, EpoxyAN 735Clamp, Loop Type, BondingMS 25083 Jumper Assembly, Electric, Bonding and Current Return20. National Bureau of Standards Handbook:H28 Screw Thread Standards for <strong>Federal</strong> Services21. Lightning Protection Institute:LPI 175Installation Standard22. American Welding Society (AWS) Standard:AWS A5.8 Brazing Filler Metal, Specification forB. Perform work to meet or exceed the requirements of the National Electrical Code andother applicable statutes, ordinances, codes and regulations of governmental authoritieshaving jurisdiction. Resolve any code violation discovered in the <strong>Contract</strong> Documentswith the <strong>Contract</strong>ing Officer prior to award of the <strong>Contract</strong>. After award of the <strong>Contract</strong>,make any corrections or additions necessary for compliance with applicable codes at noadditional cost to the Owner.C. Perform work for electrical utility substructure system in accordance with local utilityrequirements. Contact local utility prior to construction, for latest details.1.06 DELIVERY AND STORAGE:Follow the Manufacturer's directions for the delivery, storage and handling of equipment andmaterials. Tightly cover equipment and materials and protect from dirt, water, chemical ormechanical injury and theft. Damaged equipment shall not be acceptable. Upon installation,protect the materials until the work is completed and accepted by the Owner.1.07 JOB CONDITIONS:A. Obtain and pay for all permits, licenses and inspections as required by law for thecompletion of the work. Comply with the requirements of the applicable utilitycompanies serving this project. Make all arrangements with the utility companies forproper coordination of the work. Certificates of approval shall be secured, paid for, anddelivered to the Owner before receiving the final acceptance of the work.B. The location of materials, equipment, devices and appliances indicated are approximateand subject to revisions at the time the work is installed. The <strong>Contract</strong> Drawings are16010-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!