12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

.FTWIC-2235June 200916010 GENERAL REQUIREMENTS FOR ELECTRICAL WORKPART 1.00GENERAL1.01 WORK INCLUDED:Furnish labor, materials, equipment and incidentals necessary for complete and operationalelectrical systems, as specified herein.1.02 RELATED WORK COVERED ELSEWHERE:This section, as well as Division 1, concerns all other sections in Division 16, and shall beconsidered a part of each of those sections as if written in their entirety.1.03 QUALITY ASSURANCE:A. ELECTRICAL CONTRACTORS' QUALIFICATIONS:Use skilled workmen, trained and experienced in their crafts, and who are familiar withthe <strong>specifications</strong> and methods of performing the work in this division. All workmenshall be properly licensed.B. WORKMANSHIP:Work shall be performed in accordance with quality, commercial practices. Theappearance of finished work shall be of equal importance with its operation. Materialsand equipment shall be installed based upon the actual dimensions and conditions at theproject site. Locations for materials or equipment requiring an exact fit shall be fieldmeasured. Conduit, transformers, and motors shall be isolated to avoid unacceptablenoise levels from objectionable vibrations from all systems.C. CONTRACT DRAWINGS:Where the electrical drawings indicate (diagrammatically or otherwise) the work intendedand the functions to be performed, even though some minor details are not shown, the<strong>Contract</strong>or shall furnish all equipment, material (other than Government furnished items),and labor to complete the installation work, and accomplish all indicated functions of theelectrical installation. Further, the <strong>Contract</strong>or shall be responsible for taking thenecessary actions to ensure that all electrical work is coordinated and compatible witharchitectural, mechanical and structural plans.D. REVIEW OTHER SECTIONS:The <strong>Contract</strong>or is to review other sections of this specification to determine electricalrequirements for equipment furnished under those sections. Coordinate all electricalrough-ins and connections for proper function of this equipment.16010-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!