12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Product data sheets for each paint product.FTWIC-2235June, 2009C. Color charts for each paint type.D. Certification of paint grade and quality.E. Provide samples of each color and sheen, prepared on 12" x 12" white cardboard panels.Identify each color on back with brand, name of color and mixing formula.1.05 REFERENCES AND STANDARDS:The applicable provisions of the following references and standards shall apply to this section asif written herein in their entirety:American Society for Testing and materials (ASTM) Publications.ASTM D 234ASTM D 360"Raw Linseed Oil""Shellac Varnishes"1.06 DELIVERY, HANDLING AND STORAGE:A. Deliver materials in the original containers with labels intact and seals unbroken. Withthe exception of ready-mixed materials, perform all mixing at plant.B. Storage space will be designated for painting materials and tools. Protect the entire floorsurface from damage or spilled paint. Keep paint containers covered at all times.Provide adequate safeguards to prevent fires and maintain storage room in cleancondition.C. Upon leaving the storage area, clean spilled paint and remove empty containers andconstruction debris. Restore room to finish condition.1.07 JOB CONDITIONS:A. <strong>Contract</strong>ing Officer's approval is required prior to beginning any painting.B. <strong>Contract</strong>or shall be responsible to coordinate factory prime coats and field painting.When shop applied primer is not compatible with the finish system specified herein,<strong>Contract</strong>or shall notify the COR and receive instructions to rectify the situation.C. Interior painting shall not begin until masonry surfaces are thoroughly cured and dry.The temperatures of spaces in the building to be painted shall be maintained above 50degrees F and kept dry.D. Exterior painting shall not be performed in rainy, damp or frosty weather, or until surfaceis thoroughly dry.E. Areas to be painted shall be broom cleaned. Unnecessary materials, tools, debris andequipment shall be removed.F. A representative area of each surface may be required to be finished on the project forapproval. Such approved surfaces will be the standard for like surfaces through the job.09901-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!