12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June, 2009C. Adjust and check operation of hardware and doors to insure proper operation. Lubricatemoving parts with graphite-type lubrication recommended by the manufacturer.D. Provide stops to protect wall surfaces at all doors. Unless otherwise specified use wallbumpers wherever possible, otherwise install overhead stops. Provide wood back-up atall wall bumpers.E. Provide all special mounting and brackets where interference with other hardware occurs.Provide door coordinators where required.3.03 LOCKS AND KEYS:A. Maintain security of locks during construction until keys are turned over to the Owner.For exterior doors, provide a system of construction locks which can be changed out to adifferent keying method for Owner's use. The <strong>Contract</strong>or may install temporary coresduring construction, which are replaced just prior to Owner's acceptance.B. Keys shall be master keyed. Furnish four (4) master keys and two (2) keys for eachseparate key set. Locks shall be keyed to conform to the keying schedule approved bythe <strong>Contract</strong>ing Officer.3.04 CLEAN AND ADJUST:A. Where it is necessary to perform cutting and fitting of hardware on surfaces which will befinished at a later date, <strong>Contract</strong>or shall remove hardware and store in a safe place untilfinish has been completed, then replace the hardware. Do not install hardware untilfinishes have been applied.B. Prior to Owner's acceptance of the building, return and check work and make finaladjustment. Clean and re-lubricate working parts. Adjust door control devices for properaction.C. Install surface mounted door closers on room side of corridors. Vestibule and interiorside of exterior doors. Do not mount closer body to jamb in any location.3.05 SCHEDULES:HW-1A. The following is a general listing of hardware requirements for contractor's reference andshall be used as a guide to prepare the final hardware schedule. Provide any item ofhardware required by established standards or practices, or to meet <strong>Federal</strong>, State, or localcodes whether or not specifically called out in the following groups.2 SETS HINGES A8112 4.5x4.5 (NRP on exterior doors)1 EACH SWEEP ROY5361 EACH CLOSER C02011 PT4C/D1 EACH WEATHERSEAL BY DOOR MANUFACTURER1 EACH THRESHOLD J361001 EACH LOCKSET F0408710-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!