12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 3.00EXECUTIONFTWIC-2235June, 20093.01 INSTALLATION:A. Set frames in place plumb and in alignment with partition. Secure floor anchors to floorwith two (2) power-activated fasteners per anchor. Brace tops of frames temporarily untilpartitions are erected. Provide appropriate jamb anchors for the type of partition in whichthe frame is installed. Each jamb shall have no less than three (3) anchors. Slush voidsbetween concrete and frame with grout.B. Provide proper anchors for all jamb conditions and anchor to partitions, as required.Install doors onto frames with proper hardware. Doors shall swing without binding andshall clear the floor throughout the swing.3.02 CLEAN AND ADJUST:After assembly, clean thoroughly, removing all rust, scale, grease and rough spots. Chemicallytreat surfaces to assure paint adherence, and provide shop coat of rust-inhibitive, oven-bakedpaint.END OF SECTION08110-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!