12.07.2015 Views

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

specifications - FAACO - Federal Aviation Administration Contract ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FTWIC-2235June, 2009G. Since portions of the building will be occupied throughout the project, the fire protectionsystem must be in operation at all times. Throughout construction, all openings in thestairwell shaft shall be sealed temporarily of permanently to maintain a properly workingstairwell pressurization system.1.04 WORK PLAN AND SCHEDULING:<strong>Contract</strong>or shall submit to the <strong>Contract</strong>ing Officer a planned construction sequence and schedulefor execution of work described on the drawings and <strong>specifications</strong>. <strong>Contract</strong>or shall use thefollowing construction sequence as a guide in determining a planned construction sequence:1. Construction <strong>Contract</strong> Award2. <strong>Contract</strong>or to prepare and submit for approval CRITICAL SUBMITTALS.3. Notice to Proceed (NTP)4. Mobilization5. Setup temporary offices6. Construction of base building7. Relocation of offices from tower to base building8. Construction in tower9. Construction of parking area10. Clean up11. <strong>Contract</strong>or’s Acceptance Inspection1.06 CONSTRUCTION LIMITS:The contractor shall confine operations, activities, material storage and employee parking withinthe facility as designated by the building owner. The <strong>Contract</strong>or shall not deviate from the limitswithout written permission from the FAA.1.07 SECURITY REQUIREMENTS:A. PERSONNEL LIST:<strong>Contract</strong>or shall provide the building owner with a list of contractor’s personnel who willrequire access to the site. The list shall be kept current during project work.B. SECURITY INVESTIGATION:<strong>Contract</strong>or’s personnel may be subject to security investigation by the FAA. Uponrequest by the Resident Engineer, the contractor shall promptly complete all securityforms provided the by Resident Engineer.C. RIGHT TO SEARCH:Current procedures at FAA facilities include the “right to search.” If in the judgment ofthe FAA, a reason to search a vehicle or person exists, such search will be made.01030-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!