12.07.2015 Views

Validation Checklist for Application of New VSAT Equipment - MCX

Validation Checklist for Application of New VSAT Equipment - MCX

Validation Checklist for Application of New VSAT Equipment - MCX

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 Capacity <strong>of</strong> UPSconnected to the PC– Trader WorkStationHard Disk (HDD) 20 GBCD ROMNetwork Card : 10/100 MbpsColor Monitor – 15”MS Windows 2000 / MS XP / MSVista (with latest service pack)Recommended: 2 KVA Online UPS_______ KVA Online UPS_____________________________(Signature <strong>of</strong> Authorised Signatory)(Rubber Stamp)Note:1. Necessary permissions / Security pass to be arranged by the Member <strong>for</strong> accessing the ro<strong>of</strong>topand <strong>of</strong>fice <strong>of</strong> the Member.2. Enclose a sketch describing the route <strong>of</strong> IFL cable from the <strong>VSAT</strong> Antenna to IDU.3. Provide any other pertinent in<strong>for</strong>mation about the site that wasn’t asked elsewhere in this <strong>for</strong>m.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!