12.07.2015 Views

Climbing Wall Manual - Entre Prises Climbing Walls

Climbing Wall Manual - Entre Prises Climbing Walls

Climbing Wall Manual - Entre Prises Climbing Walls

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(Imprint <strong>Wall</strong> Assembly, continued)The lengths of the pipe correspond with the different increments indicated on theplan (0, 25 cm, 50 cm,..., 350 cm). The specifications of the pipe and the live loadstandards for climbing wall limits the useable pinch pipe length to 3.5 meters. If thetopography you choose overhangs more than 3.5 meters, it is necessary to installadditional framework. Connection of the pipe substructure to the primary supportstructure is via Angle Clips attached to Unistrut channel railing, which is fixed to theprimary support structure (typically welded). The diagonal pipes are sized such that theycan be connected to the Unistrut channel railing at the same Angle Clip that connects thenext highest horizontal pipe. All fasteners must be securely tightened and channel nutsvisually inspected for proper installation.1/2" Grade 5 boltsw/ lock washersHorizontal pipeDiagonal pipeUnistrut (connect edto support wall)1/2" channel nutscompatible w/ strutAngle clipDETAIL: Typ. Pinch Pipe t o St rut Conn.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!