Practice of Pile Foundation Treatment Based on ZSOIL.PC
Practice of Pile Foundation Treatment Based on ZSOIL.PC Practice of Pile Foundation Treatment Based on ZSOIL.PC
- Page 3: • Functions related to Pi
- Page 6 and 7: 侧 摩 阻 力 (kPa)18016014012010
- Page 8 and 9: Functions related to Pile</
- Page 10 and 11: • Practice <stro
- Page 14 and 15: Practice o
- Page 16 and 17: Practice o
- Page 18 and 19: Practice o
- Page 20 and 21: Practice o
- Page 22 and 23: Practice o
- Page 24 and 25: Practice o
- Page 26 and 27: Practice o
- Page 28 and 29: Practice o
- Page 30 and 31: Acknowledgements• Thanks to the d
<str<strong>on</strong>g>Practice</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Pile</str<strong>on</strong>g> <str<strong>on</strong>g>Foundati<strong>on</strong></str<strong>on</strong>g> treatmentGeneral informati<strong>on</strong>• Informati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> pile Pre-stressed c<strong>on</strong>crete pipe pile(PHC), diameter 500mm, thickness 125mm,length 30.0m(segment I :15m + segment II :15m), bearing capacity 2500kN Static piling method is used to drive the pileGround surface ,+30.86mBottom <str<strong>on</strong>g>of</str<strong>on</strong>g> basement ,+13.86m<str<strong>on</strong>g>Pile</str<strong>on</strong>g> length, 30mStatic driving machineBottom <str<strong>on</strong>g>of</str<strong>on</strong>g> pile ,-16.14mPHC500, 15m lengthper segment