BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber

BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber

12.07.2015 Views

3. Select F2 Load Control Diagnostics, and record the load bank step weights.Step Number1Step Weight234567891011121314154. Press ESC to return to the previous menu.5. Press ESC to return to the main menu, and press ESC to exit the program.6. Start the Windows BCT program by double-clicking the BCT icon. To open thecalibration dialog box, select Calibration from the main menu and enter the passwordalber. Type the Calibration K values recorded above.7. To open the Load Bank setup dialog box, select Load Bank from the Setup menu andenter the password alber. Type the shunt rating value recorded above. Type the loadbank step weights recorded above.8. If more than one load bank configuration is required, click the Add button and configurea second load bank. Repeat as necessary to complete the load bank configurations.9. The Windows BCT program is now ready for operation.74

18. BCT-2000 Calibration RecordCustomer ______________________________________________________________________________P.O. Number ___________________________________________________________________________Calibration Date ________________________________________________________________________System Serial No. ____________________________________________ Version ________________Configured Shunt (amps/mV) ______________________________________________________________Configured Load Bank Steps ______________________________________________________________Dwg. No. of Load Bank (if known) __________________________________________________________Computer Serial No. _____________________________________________________________________CELL Before Calibration After Calibration0.1% of reading 0.01VSelected InputDMM InputReadingCell(As-Found)DMM InputReadingCell(As-Left)+12V+2VOVERALLCURRENTBefore CalibrationAfter Calibration0.1% of reading 3ASelected InputDMM InputReadingOverall Current(As-Found)DMM InputReadingOverall Current(As-Left)+50mV+100mV+150mV-50mV-100mV-150mV75

18. <strong>BCT</strong>-<strong>2000</strong> Calibration RecordCustomer ______________________________________________________________________________P.O. Number ___________________________________________________________________________Calibration Date ________________________________________________________________________System Serial No. ____________________________________________ Version ________________Configured Shunt (amps/mV) ______________________________________________________________Configured Load Bank Steps ______________________________________________________________Dwg. No. of Load Bank (if known) __________________________________________________________Computer Serial No. _____________________________________________________________________CELL Before Calibration After Calibration0.1% of reading 0.01VSelected InputDMM InputReadingCell(As-Found)DMM InputReadingCell(As-Left)+12V+2VOVERALLCURRENTBefore CalibrationAfter Calibration0.1% of reading 3ASelected InputDMM InputReadingOverall Current(As-Found)DMM InputReadingOverall Current(As-Left)+50mV+100mV+150mV-50mV-100mV-150mV75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!