12.07.2015 Views

BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber

BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber

BCT-2000 Software and BCT-128 and BCT-256 User's Guide - Alber

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

15. System CalibrationThis section describes the calibration of the <strong>BCT</strong>-<strong>2000</strong> system. First, check the system in the asfoundcondition. If all as-found parameters are within specification, calibration does not have tobe performed.Figure 53. CalibrationCalibrating the preamp affects the overall current <strong>and</strong> intertier calibration. If, after completing theas-found readings, you determine that the preamp needs calibration, then the overall current <strong>and</strong>intertiers will also have to be calibrated.The following is required for equipment calibration:Albércorp CS-<strong>2000</strong> calibration source (recommended)A 4½ digit calibrated digital multimeter (DMM)Two 37-pin ribbon cables for connecting the CS-<strong>2000</strong> to the <strong>BCT</strong>.If a CS-<strong>2000</strong> is not available, use a 0 to 12VDC source for cell calibration, a 100mV sourcefor current calibration, <strong>and</strong> a 0 to 600VDC source for OV calibration. (This may be acombined 0 to 600VDC source.) The original sense lead harness must be used.WARNING: High voltages exist inside the <strong>BCT</strong>-<strong>2000</strong> system components <strong>and</strong> on the CS-<strong>2000</strong>terminals. Calibration must be performed only by technically qualified persons. Observeelectrical safety precautions when removing <strong>and</strong> installing the <strong>BCT</strong> cover, <strong>and</strong> when connectingleads <strong>and</strong> making adjustments.60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!