11.4.4. Rundown TestA rundown test is similar to a service test, except the test uses the system load instead ofa controlled load. Rundown has only one step <strong>and</strong> no shutdown levels.Figure 10. Setup - Test Setup: Rundown11.4.5. Charger TestWhen the charger test is selected, the only parameters recorded to the report file areOverall Voltage <strong>and</strong> Current.Figure 11. Setup - Test Setup: Charger22