ANSALDO ENERGIA Power Generation Solutions
ANSALDO ENERGIA Power Generation Solutions ANSALDO ENERGIA Power Generation Solutions
Ferrera Erbognone2 x 400 MW + 1 x 250 MWCombined CyclePower Palnt
Ferrera Erbognone Power PlantService activities performed by Ansaldo Energiawithin the Long Term Service AgreementIn 2001 Ansaldo Energia was awarded the Long ThermService Agreement ( LTSA ) to perform services on thegas turbine, steam turbines and relevant generatorsof the entire Enipower combined cycle fleet.The time frame validity of the above mentioned Contractis from the PAC of each power plant up to theachievement of 50 KEOH of each Gas Turbine.The main deliveries of the LTSA are the following:• Planned maintenance activities on GT, ST,Generator, bypass valves, HVAC• Unplanned maintenance activities• Spare parts initial stock and stock replenishment• Strategic spare parts (spare rotor, Hub, turbineblade carrier, rotor cover)• Gas turbine blades and vanes refurbishment• Remote monitoring and diagnostic• Warranties: Availability, Power & Efficiency, EmissionsAll the power plant units are continuously monitoredby Ansaldo Energia with the purpose to supply an effectiveremote diagnostic assistance in the areas ofthermodynamic (Power Output, Efficiency, Turbine InletTemperature, etc.), vibrations, emissions, combustionanalysis.The remote monitoring system is also the main toolto support the predictive maintenance.Among the Enipower fleet, Ferrera Erbognone representa bright example of the first power plant installedand then in operation, and having the AE94.3A gasfired turbine as well as the AE94.2K gas turbine fedwith syngas.
- Page 1 and 2: POWER GENERATIONSOLUTIONS
- Page 3: Service OfferingThe Ansaldo Energia
- Page 7 and 8: Contract: San SeveroClient: En Plus
- Page 9 and 10: Contract: BayetClient: 3CB SAS (Ate
- Page 11 and 12: Turano Lodigiano 1 x 800 MWCombined
- Page 13: Contract: TuranoLodigianoClient: So
- Page 22 and 23: Moncalieri 1 x 389 MWCombined Cycle
- Page 24 and 25: Rizziconi 2 x 385 MWCombined CycleP
- Page 26 and 27: Escatron 1 x 800 MWCombined CyclePo
- Page 28 and 29: Sparanise 2 x 385 MWCombined CycleP
- Page 30 and 31: Leinì 1 x 385 MWCombined CyclePowe
- Page 32 and 33: Vado Ligure 1 x 781 MWCombined Cycl
- Page 34 and 35: Rosignano 1 x 388 MWCombined CycleP
- Page 36: Voghera 1 x 400 MWCombined CyclePow
- Page 41: Contract: Ferrera ErbognoneClient:
- Page 45 and 46: Contract: ServolaClient: Elettra GL
Ferrera Erbognone <strong>Power</strong> PlantService activities performed by Ansaldo Energiawithin the Long Term Service AgreementIn 2001 Ansaldo Energia was awarded the Long ThermService Agreement ( LTSA ) to perform services on thegas turbine, steam turbines and relevant generatorsof the entire Enipower combined cycle fleet.The time frame validity of the above mentioned Contractis from the PAC of each power plant up to theachievement of 50 KEOH of each Gas Turbine.The main deliveries of the LTSA are the following:• Planned maintenance activities on GT, ST,Generator, bypass valves, HVAC• Unplanned maintenance activities• Spare parts initial stock and stock replenishment• Strategic spare parts (spare rotor, Hub, turbineblade carrier, rotor cover)• Gas turbine blades and vanes refurbishment• Remote monitoring and diagnostic• Warranties: Availability, <strong>Power</strong> & Efficiency, EmissionsAll the power plant units are continuously monitoredby Ansaldo Energia with the purpose to supply an effectiveremote diagnostic assistance in the areas ofthermodynamic (<strong>Power</strong> Output, Efficiency, Turbine InletTemperature, etc.), vibrations, emissions, combustionanalysis.The remote monitoring system is also the main toolto support the predictive maintenance.Among the Enipower fleet, Ferrera Erbognone representa bright example of the first power plant installedand then in operation, and having the AE94.3A gasfired turbine as well as the AE94.2K gas turbine fedwith syngas.