12.07.2015 Views

Flood Management Plan - Shire of Yarra Ranges

Flood Management Plan - Shire of Yarra Ranges

Flood Management Plan - Shire of Yarra Ranges

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SevilleWooriYallock<strong>Yarra</strong>JunctionOlindaWooriYallockCreekLittle <strong>Yarra</strong>RiverMonbulkFigure 10Woori Yallock Creek Study Area - 100 year ARI <strong>Flood</strong>ing6.5.3 Cardinia Creek Study AreaThe Cardinia Creek Catchment is a small catchment (139km 2 ) located on thesouthern side <strong>of</strong> the <strong>Shire</strong> <strong>of</strong> <strong>Yarra</strong> <strong>Ranges</strong>, adjacent to Woori Yallock andUpper Dandenong Creek Study Areas. Cardinia Reservoir is the easternboundary <strong>of</strong> the study area. The catchment is partially rural and urban. Thedrain and waterway layout within the study area is shown in Figure 11. Majorpoints include the following:• Muddy Creek flows from Selby to Narre Warren East over a distance <strong>of</strong>6.82km.• Muddy Creek is not part <strong>of</strong> the <strong>Yarra</strong> catchment as it flows south toCardinia Creek.• Council drainage only is found within the Cardinia Creek Study Area (NoMW drainage).24 Melbourne Water <strong>Shire</strong> <strong>of</strong> <strong>Yarra</strong> <strong>Ranges</strong> <strong>Flood</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!