12.07.2015 Views

Quality Control in Drawings and Specifications

Quality Control in Drawings and Specifications

Quality Control in Drawings and Specifications

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Pa<strong>in</strong>t project<strong>in</strong>g PVC vent pipes black4. Pa<strong>in</strong>t<strong>in</strong>g general notes:a. Pa<strong>in</strong>t all exposed surfaces, except where the draw<strong>in</strong>gs <strong>in</strong>dicate thata surface or material is not to be pa<strong>in</strong>ted or is to rema<strong>in</strong> natural. Ifthe draw<strong>in</strong>gs do not specifically mention an item or a surface, pa<strong>in</strong>tthe item or surface the same color as similar adjacent materials orsurfaces. Also pa<strong>in</strong>t the follow<strong>in</strong>g items: un<strong>in</strong>sulated metal pip<strong>in</strong>g,un<strong>in</strong>sulated plastic pip<strong>in</strong>g, pipe hangers <strong>and</strong> supports, tanks that donot have factory-applied f<strong>in</strong>al f<strong>in</strong>ishes, visible portions of <strong>in</strong>ternalsurfaces of metal ducts, without l<strong>in</strong>er, beh<strong>in</strong>d air <strong>in</strong>lets <strong>and</strong> outlets,duct, equipment, <strong>and</strong> pipe <strong>in</strong>sulation hav<strong>in</strong>g cotton or canvas<strong>in</strong>sulation cover<strong>in</strong>g or other pa<strong>in</strong>table jacket material, mechanicalequipment that is <strong>in</strong>dicated to have a factory-primed f<strong>in</strong>ish for fieldpa<strong>in</strong>t<strong>in</strong>g, switchgear, panelboards, <strong>and</strong> electrical equipment that is<strong>in</strong>dicated to have a factory-primed f<strong>in</strong>ish for field pa<strong>in</strong>t<strong>in</strong>g, surfacesbeh<strong>in</strong>d movable equipment <strong>and</strong> furniture. Before f<strong>in</strong>al <strong>in</strong>stallation,pa<strong>in</strong>t surfaces beh<strong>in</strong>d permanently fixed equipment or furniture withprime coat only. Pa<strong>in</strong>t front <strong>and</strong> backsides of access panels,removable or h<strong>in</strong>ged covers, <strong>and</strong> similar h<strong>in</strong>ged items to matchexposed surfaces.b. Do not pa<strong>in</strong>t pref<strong>in</strong>ished items such as architectural woodwork <strong>and</strong>casework, acoustical wall panels, metal toilet enclosures, metallockers, unit kitchens, elevator entrance doors <strong>and</strong> frames, elevatorequipment, f<strong>in</strong>ished mechanical <strong>and</strong> electrical equipment, lightfixtures, distribution cab<strong>in</strong>ets; concealed surfaces such as foundationspaces, furred areas, ceil<strong>in</strong>g plenums, utility tunnels, pipe spaces,duct shafts, elevator shafts; f<strong>in</strong>ished metal surfaces such asanodized alum<strong>in</strong>um, sta<strong>in</strong>less steel, chromium plate, copper, bronze<strong>and</strong> brass; <strong>and</strong> operat<strong>in</strong>g parts <strong>and</strong> labels.c. Pa<strong>in</strong>t<strong>in</strong>g Preparation:d. Remove plates, mach<strong>in</strong>ed surfaces, <strong>and</strong> similar items already <strong>in</strong>place that are not to be pa<strong>in</strong>ted. If removal is impractical orimpossible because of size or weight of item, provide surface-appliedprotection before surface preparation <strong>and</strong> pa<strong>in</strong>t<strong>in</strong>g.e. Clean substrates of substances that could impair bond of pa<strong>in</strong>ts,<strong>in</strong>clud<strong>in</strong>g dirt, oil, grease, <strong>and</strong> <strong>in</strong>compatible pa<strong>in</strong>ts <strong>and</strong> encapsulants.Coord<strong>in</strong>ation of shop-applied prime coats with topcoats is critical.Remove <strong>in</strong>compatible primers <strong>and</strong> reprime substrate with compatibleprimers as required to produce pa<strong>in</strong>t systems <strong>in</strong>dicated.f. Concrete Substrates: Remove release agents, cur<strong>in</strong>g compounds,efflorescence, <strong>and</strong> chalk. Do not pa<strong>in</strong>t surfaces if moisture content10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!