Quality Control in Drawings and Specifications
Quality Control in Drawings and Specifications
Quality Control in Drawings and Specifications
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3. Pa<strong>in</strong>t project<strong>in</strong>g PVC vent pipes black4. Pa<strong>in</strong>t<strong>in</strong>g general notes:a. Pa<strong>in</strong>t all exposed surfaces, except where the draw<strong>in</strong>gs <strong>in</strong>dicate thata surface or material is not to be pa<strong>in</strong>ted or is to rema<strong>in</strong> natural. Ifthe draw<strong>in</strong>gs do not specifically mention an item or a surface, pa<strong>in</strong>tthe item or surface the same color as similar adjacent materials orsurfaces. Also pa<strong>in</strong>t the follow<strong>in</strong>g items: un<strong>in</strong>sulated metal pip<strong>in</strong>g,un<strong>in</strong>sulated plastic pip<strong>in</strong>g, pipe hangers <strong>and</strong> supports, tanks that donot have factory-applied f<strong>in</strong>al f<strong>in</strong>ishes, visible portions of <strong>in</strong>ternalsurfaces of metal ducts, without l<strong>in</strong>er, beh<strong>in</strong>d air <strong>in</strong>lets <strong>and</strong> outlets,duct, equipment, <strong>and</strong> pipe <strong>in</strong>sulation hav<strong>in</strong>g cotton or canvas<strong>in</strong>sulation cover<strong>in</strong>g or other pa<strong>in</strong>table jacket material, mechanicalequipment that is <strong>in</strong>dicated to have a factory-primed f<strong>in</strong>ish for fieldpa<strong>in</strong>t<strong>in</strong>g, switchgear, panelboards, <strong>and</strong> electrical equipment that is<strong>in</strong>dicated to have a factory-primed f<strong>in</strong>ish for field pa<strong>in</strong>t<strong>in</strong>g, surfacesbeh<strong>in</strong>d movable equipment <strong>and</strong> furniture. Before f<strong>in</strong>al <strong>in</strong>stallation,pa<strong>in</strong>t surfaces beh<strong>in</strong>d permanently fixed equipment or furniture withprime coat only. Pa<strong>in</strong>t front <strong>and</strong> backsides of access panels,removable or h<strong>in</strong>ged covers, <strong>and</strong> similar h<strong>in</strong>ged items to matchexposed surfaces.b. Do not pa<strong>in</strong>t pref<strong>in</strong>ished items such as architectural woodwork <strong>and</strong>casework, acoustical wall panels, metal toilet enclosures, metallockers, unit kitchens, elevator entrance doors <strong>and</strong> frames, elevatorequipment, f<strong>in</strong>ished mechanical <strong>and</strong> electrical equipment, lightfixtures, distribution cab<strong>in</strong>ets; concealed surfaces such as foundationspaces, furred areas, ceil<strong>in</strong>g plenums, utility tunnels, pipe spaces,duct shafts, elevator shafts; f<strong>in</strong>ished metal surfaces such asanodized alum<strong>in</strong>um, sta<strong>in</strong>less steel, chromium plate, copper, bronze<strong>and</strong> brass; <strong>and</strong> operat<strong>in</strong>g parts <strong>and</strong> labels.c. Pa<strong>in</strong>t<strong>in</strong>g Preparation:d. Remove plates, mach<strong>in</strong>ed surfaces, <strong>and</strong> similar items already <strong>in</strong>place that are not to be pa<strong>in</strong>ted. If removal is impractical orimpossible because of size or weight of item, provide surface-appliedprotection before surface preparation <strong>and</strong> pa<strong>in</strong>t<strong>in</strong>g.e. Clean substrates of substances that could impair bond of pa<strong>in</strong>ts,<strong>in</strong>clud<strong>in</strong>g dirt, oil, grease, <strong>and</strong> <strong>in</strong>compatible pa<strong>in</strong>ts <strong>and</strong> encapsulants.Coord<strong>in</strong>ation of shop-applied prime coats with topcoats is critical.Remove <strong>in</strong>compatible primers <strong>and</strong> reprime substrate with compatibleprimers as required to produce pa<strong>in</strong>t systems <strong>in</strong>dicated.f. Concrete Substrates: Remove release agents, cur<strong>in</strong>g compounds,efflorescence, <strong>and</strong> chalk. Do not pa<strong>in</strong>t surfaces if moisture content10