2012-2013 Budget - City of Saginaw MI

2012-2013 Budget - City of Saginaw MI 2012-2013 Budget - City of Saginaw MI

saginaw.mi.com
from saginaw.mi.com More from this publisher
12.07.2015 Views

CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 174840 Update Heating System Return ActivatedSludge BuildingSF 30,000 30,000 30,000 0 0 0If deferred: Priority 1 1TOTAL PROJECT COST 60,000Analysis and Explanation:Repair heating and air conditioning system. Upgrade for efficiency and energy savings. (Original system 1969-70)Operational ImpactAir conditioning units have proven to be somewhat unreliable the last few years. The improvements would prevent the necessity of costly repairs and longperiods of downtime.4840 Replace Primary Settling Tank Weirs &Baffles (2 each year)SF 50,000 50,000 60,000 0 0 0If deferred: Priority 1 1TOTAL PROJECT COST 110,000Analysis and Explanation:Replacement of deteriorated steel weirs and baffles on the 60 year old original primary settling tanks. Current weirs and baffles have outlasted projected 30 yearlife span.Operational ImpactWeirs and baffles are used to change the rate and direction of flow into and out of various processes to enhance treatment efficacy.4840 Accusonic Flow Meter Replacement at RemoteFacilitiesSF 80,000 80,000 80,000 80,000 85,000 50,000If deferred: Priority 1 1TOTAL PROJECT COST 375,000Analysis and Explanation:Replace where necessary the Accusonic flow meters at retention treatment basins. FY 2016-17 update sensors and repair older units.Operational ImpactAccurate measurement of flow is crucial to the treatment process. Flows are used to determine adequate chemical dosages for the treatment process.358

CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 174840 Forklift Replacement Purchase SF 25,000 25,000 0 0 0 0If deferred: Priority 2 2TOTAL PROJECT COST 25,000Analysis and Explanation:Replace 1998 Nissan forklift with a larger 10,000 - 12,000 lb. capacity used/reconditioned forklift. Much of the equipment at the WWTP is heavier than ourcurrent forklift can safely lift.Operational ImpactThe purchase of a larger capacity forklift would allow for easier offloading of equipment and supplies. It would also allow for easier transportation of large partsto different areas of the plant.4840 Clean, Test, & Calibrate Plant & RTBElectrical SubstationsSF 40,000 40,000 40,000 40,000 0 0If deferred: Priority 1 1Analysis and Explanation:Clean, test and calibrate electrical substations at the WWT Plant and the Retention Treatment Basins.TOTAL PROJECT COST 120,000Operational ImpactThe wastewater treatment plant does not have a back-up power supply. This annual maintenance assures reliable delivery of powered to the plant and remotetreatment basins.4840 Reconstruction/repair floor incinerator area SF 30,000 30,000 20,000 0 0 0If deferred: Priority 3 3TOTAL PROJECT COST 50,000Analysis and Explanation:Repair/install floor where incinerators were removed. (Currently open from basement to second floor.) Add structural steel & install.Operational ImpactThis project would increase usable square footage space. The area could be utilized as needed by the wastewater staff.359

CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 174840 Update Heating System Return ActivatedSludge BuildingSF 30,000 30,000 30,000 0 0 0If deferred: Priority 1 1TOTAL PROJECT COST 60,000Analysis and Explanation:Repair heating and air conditioning system. Upgrade for efficiency and energy savings. (Original system 1969-70)Operational ImpactAir conditioning units have proven to be somewhat unreliable the last few years. The improvements would prevent the necessity <strong>of</strong> costly repairs and longperiods <strong>of</strong> downtime.4840 Replace Primary Settling Tank Weirs &Baffles (2 each year)SF 50,000 50,000 60,000 0 0 0If deferred: Priority 1 1TOTAL PROJECT COST 110,000Analysis and Explanation:Replacement <strong>of</strong> deteriorated steel weirs and baffles on the 60 year old original primary settling tanks. Current weirs and baffles have outlasted projected 30 yearlife span.Operational ImpactWeirs and baffles are used to change the rate and direction <strong>of</strong> flow into and out <strong>of</strong> various processes to enhance treatment efficacy.4840 Accusonic Flow Meter Replacement at RemoteFacilitiesSF 80,000 80,000 80,000 80,000 85,000 50,000If deferred: Priority 1 1TOTAL PROJECT COST 375,000Analysis and Explanation:Replace where necessary the Accusonic flow meters at retention treatment basins. FY 2016-17 update sensors and repair older units.Operational ImpactAccurate measurement <strong>of</strong> flow is crucial to the treatment process. Flows are used to determine adequate chemical dosages for the treatment process.358

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!