2012-2013 Budget - City of Saginaw MI
2012-2013 Budget - City of Saginaw MI 2012-2013 Budget - City of Saginaw MI
CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 17WEED ABATEMENT4480 Replacement of Flail Mowers (TRF-75C) GF 27,000 0 0 9,000 0 9,000If deferred: Deferred due to fiscal constraints. Priority 1TOTAL PROJECT COST 45,000Analysis and Explanation:Purchase of three (3) replacement flail mower attachments in FY13 and one every other year to stay ahead of breakdowns and repairs. Each year weed abatementsightings and number of cuts increases between 6% to 8%.Operational ImpactWith over 7,000 property cuts annually, it is critical to the operation of the parks to provide compliance with the noxious weed ordinance and cut properties tokeep the blight to a minimum as it relates to noxious weeds and keep safety at intersections for corner clearances.4480 Replacement of Utility Tractor GF 24,000 0 12,000 0 12,000 0If deferred: Deferred due to fiscal constraints. Priority 1TOTAL PROJECT COST 48,000Analysis and Explanation:Purchase two replacement diesel utility tractors for FY12/13 for cutting lots that are in violation of City high weed abatement codes. The current tractors werepurchased in 1999 and are old and unreliable costing more to keep repaired. Additional purchases are needed in FY13/14 and FY15/16 to maintain reliableequipment and services.Operational ImpactWith over 7,000 property cuts annually, it is critical to the operation of the parks to provide compliance with the noxious weed ordinance and cut properties tokeep the blight to a minimum as it relates to noxious weeds and keep safety at intersections for corner clearances. If the existing tractors are no longer serviceable,the City will be unable to keep up with the cuts required.4480 4x4 Heavy Duty Pickup Trucks GF 68,000 0 0 36,000 0 36,000If deferred: Deferred due to fiscal constraints. Priority 1TOTAL PROJECT COST 140,000Analysis and Explanation:Purchase 2 new weed abatement support trucks in FY13 and one new truck every other year thru FY17. These new trucks are should have heavy duty suspensionand snow plows to remove snow during the winter season.Operational ImpactThe City requires these pick ups to provide monitoring and citing for noxious weed ordinances and snow removal in the winter. If the City does not haveoperational vehicles it will not be able to monitor grass cutting and cite property owners. Also, the City may not be able to provide snow removal services.TOTAL WEED ABATEMENT233,000348
CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 17BUILDING AND GROUND MAINTENANCE7575 Replacement of 2nd City Hall Boiler HeatingSystemGF 75,000 0 0 0 0 0If deferred: Other alternatives are being sought. Priority 1TOTAL PROJECT COST 75,000Analysis and Explanation:Replacement of the second city hall boiler heating system. The first one of the two twin boilers was replaced in FY2010-11. The second boiler is unreliable andas a backup.Operational ImpactRemaining Boiler needs replacement. If not replaced, could cause potential failure and inability to heat City hall thru the winter. Existing Boilers and steam trapswere replaced in 2011.7575 Replacement of City Hall Roof GF 85,000 0 0 0 0 0If deferred: Other alternatives are being sought. Priority 1TOTAL PROJECT COST 85,000Analysis and Explanation:The current roof on City Hall is a rubber membrane material and was installed in 1990 and it's 20 year warranty expired in 2010. The rubber has been repairedmany times and continues to leak. Patching seams and repairing burned holes from fireworks are not under warranty. It is estimated that this roof will continue tocause internal damage if it is not replaced.Operational ImpactRepair of leaking roof will keep existing ceiling tiles and interior damage from occurring. Otherwise other damage related expenses will be more than likely.349
- Page 333 and 334: charge was too high and that enterp
- Page 335 and 336: EXPENDITURE ANALYSIS DETAIL2012/201
- Page 337 and 338: SELF - INSURANCE FUNDREVENUE BUDGET
- Page 339 and 340: CITY OF SAGINAWWORKERS COMPENSATION
- Page 341 and 342: REVENUE BUDGET SUMMARYWORKERS COMPE
- Page 343 and 344: EXPENDITURE ANALYSIS DETAIL2012/201
- Page 345 and 346: UNFUNDED LIABILITIES FUND (674)RESO
- Page 347 and 348: The above graph reflects numerical
- Page 349 and 350: REVENUE BUDGET SUMMARYFOREST LAWN C
- Page 351 and 352: OAKWOOD CEMETERY (712)RESOURCE ALLO
- Page 353 and 354: EXPENDITURE BUDGET SUMMARYOakwood C
- Page 355 and 356: POLICE AND FIRE PENSION FUND (732)R
- Page 357 and 358: The above graph reflects numerical
- Page 359 and 360: EXPENDITURE ANALYSIS DETAIL2012/201
- Page 361 and 362: 20022003200420052006200720082009201
- Page 363 and 364: CAPITAL IMPROVEMENT PLAN
- Page 365 and 366: for review and approval. If City Co
- Page 367 and 368: intersection of Tittabawassee and C
- Page 369 and 370: CITY OF SAGINAWCIP PROJECTS FOR FY
- Page 371 and 372: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 373 and 374: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 375 and 376: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 377 and 378: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 379 and 380: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 381 and 382: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 383: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 387 and 388: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 389 and 390: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 391 and 392: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 393 and 394: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 395 and 396: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 397 and 398: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 399 and 400: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 401 and 402: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 403 and 404: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 405 and 406: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 407 and 408: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 409 and 410: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 411 and 412: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 413 and 414: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 415 and 416: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 417 and 418: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 419 and 420: CITY OF SAGINAWCAPITAL IMPROVEMENT
- Page 421 and 422: Performance Management PlanIntroduc
- Page 423 and 424: City AttorneyAndre Borrello, City A
- Page 425 and 426: Community Public Safety - Fire Phil
- Page 427 and 428: Community Public Safety - PoliceBri
- Page 429 and 430: Community Policing - (summary of se
- Page 431 and 432: Inspections - (summary of services)
- Page 433 and 434: The key performance indicator to
CITY OF SAGINAWCAPITAL IMPROVEMENT PLAN(please note that only those items that were budgeted or has request for multiple years are reflected in the report)ManagerRequest ApprovedFuture YearsDept. Project Funding FY 13 FY 13 FY 14 FY 15 FY 16 FY 17BUILDING AND GROUND MAINTENANCE7575 Replacement <strong>of</strong> 2nd <strong>City</strong> Hall Boiler HeatingSystemGF 75,000 0 0 0 0 0If deferred: Other alternatives are being sought. Priority 1TOTAL PROJECT COST 75,000Analysis and Explanation:Replacement <strong>of</strong> the second city hall boiler heating system. The first one <strong>of</strong> the two twin boilers was replaced in FY2010-11. The second boiler is unreliable andas a backup.Operational ImpactRemaining Boiler needs replacement. If not replaced, could cause potential failure and inability to heat <strong>City</strong> hall thru the winter. Existing Boilers and steam trapswere replaced in 2011.7575 Replacement <strong>of</strong> <strong>City</strong> Hall Ro<strong>of</strong> GF 85,000 0 0 0 0 0If deferred: Other alternatives are being sought. Priority 1TOTAL PROJECT COST 85,000Analysis and Explanation:The current ro<strong>of</strong> on <strong>City</strong> Hall is a rubber membrane material and was installed in 1990 and it's 20 year warranty expired in 2010. The rubber has been repairedmany times and continues to leak. Patching seams and repairing burned holes from fireworks are not under warranty. It is estimated that this ro<strong>of</strong> will continue tocause internal damage if it is not replaced.Operational ImpactRepair <strong>of</strong> leaking ro<strong>of</strong> will keep existing ceiling tiles and interior damage from occurring. Otherwise other damage related expenses will be more than likely.349