Link to site visit report - Network for Earthquake Engineering ...

Link to site visit report - Network for Earthquake Engineering ...

Link to site visit report - Network for Earthquake Engineering ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Summary of Findings1. Environmental, Health and Safety (EH&S)Risks• Lack of documentation of safety practices.• Corrective action - Site <strong>to</strong> develop checklist <strong>for</strong> monthly walk-throughs and keep on file. A copyof the developed checklist should be provided <strong>to</strong> NEEScomm by July 1, 2012.• The <strong>site</strong> has no <strong>for</strong>mal procedure <strong>for</strong> signing liability waivers <strong>for</strong> outside users.• Corrective action - Develop and implement a procedure <strong>for</strong> signing of liability waivers (includingREU students).Recommendations• Have University of Illinois EH&S conduct annual Safety Evaluation with a <strong>for</strong>mal <strong>report</strong> andreply.• Revise safety plan regarding fall protection height.• Evaluate student access <strong>to</strong> lab area during normal hours of operation.Best Practices• Lab access controlled by keycard after hours.• Load cell used <strong>for</strong> crane lifts.• Local fire department comes through every 6 months <strong>for</strong> a walk through.2. Facility Management, Equipment and Research Project SupportRisks5• Project progress and completion rate is unsatisfac<strong>to</strong>ry and project scheduling is not transparent.Schedule <strong>report</strong>ing is inaccurate.o Corrective action – Provide an updated schedule <strong>to</strong> NEEScomm by May 15, 2012(Completed). Develop a detailed plan <strong>to</strong> meet the schedule by June 1, 2012. Providebi-weekly schedule updates <strong>to</strong> NEEScomm every other Friday, starting June 1, 2012.• User survey results in the areas of project scheduling, staffing, and readiness are very low.• Corrective action - Develop a plan <strong>to</strong> address user survey results (including scheduling, staffing,and readiness issues) and provide the plan <strong>to</strong> NEEScomm by June 15, 2012.Recommendations• Develop <strong>for</strong>mal succession plan <strong>for</strong> key personnel (identify primary responsibilities and how theywill be covered).• Review and update equipment and sensor in<strong>for</strong>mation on NEEShub.• Develop a plan <strong>to</strong> complete hydraulic line upgrades.• Review and update NEES@UIUC web<strong>site</strong>.Follow up Items• Provide updated utilization spreadsheet that matches actual schedule.• Provide a list of outstanding Kryp<strong>to</strong>n issues.• Provide a copy of Shore-Western maintenance contract (Complete).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!