12.07.2015 Views

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Lambda</strong> <strong>20</strong>, <strong>Lambda</strong> <strong>40</strong> UV/Vis Spectrometers3. Replace the spent fuse with a new one of the same type <strong>and</strong> rating:VoltageSt<strong>and</strong>ard100 V – 1<strong>20</strong> V 6.3 A slow-blow210 V – 2<strong>40</strong> V 3.15 A slow-blowNOTE: The module has two fuses.4. Replace the fuse holder.Align the lug at the bottom of the fuse holder with the slot in the socket. Aclick is heard as each lug snaps into place.NOTE: If you use the correct fuses but the instrument still does not work correctly, or thefuses blow repeatedly, contact your PerkinElmer office or representative.Maintaining the Internal PrinterThe internal printer needs no special maintenance. You only need to:• Change the printer paper• Change the printer ribbonwhen necessary.Changing the Printer Paper1. Lift off <strong>and</strong> remove the old paper roll.2. Replace with a new paper roll.3. Cut square the end of the paper.4. Carefully feed the end of the paper into the slot at the top of the printer.66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!