Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Lambda</strong> <strong>20</strong>, <strong>Lambda</strong> <strong>40</strong> UV/Vis SpectrometersTemperature SensorWARNINGElectrical hazardTo prevent potential injury to yourself <strong>and</strong> damage to the instrument,switch OFF all instruments in the system <strong>and</strong> disconnect them from theline power supply before you alter, or make any new, electricalconnections.<strong>Installation</strong> OverviewNOTE: When connecting the temperature sensor, align the red mark on the plug with the redmark on the socket.Pull the collar on the plug back to connect/disconnect the plug. Release the collar tosecure the plug.Connector on Spectrometer:<strong>Installation</strong>:Cables:Sample Compartment Cover:Temp J10See temperature sensor descriptionLead through the tube portsUnchanged44