12.07.2015 Views

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Lambda</strong> <strong>20</strong>, <strong>Lambda</strong> <strong>40</strong> UV/Vis SpectrometersConnecting to the Electrical SupplyElectrical HazardWARNING• To prevent potential injury to yourself <strong>and</strong> damage to theinstrument, first make the electrical connections between theinstruments in the system before connecting to the line powersupply.• The spectrometer automatically adjusts to the correct operatingvoltage.Before starting the instrument for the first time, make sure that thecorrect fuse is fitted to your line power supply.If you have a different fuse, change it for the correct one.Do not connect the spectrometer to the line power supply if thewrong fuse is fitted.1. Make sure that the correct fuses are fitted in the holder at the rear of thespectrometer (see Changing Fuses on page 65).VoltageSt<strong>and</strong>ard100 V – 1<strong>20</strong> V 6.3 A slow-blow210 V – 2<strong>40</strong> V 3.15 A slow-blowNOTE: The module has two fuses.2. Make sure that the plug fitted to the line power cord provided with thespectrometer is suitable for your local electrical outlets.If it is not, remove it <strong>and</strong> fit a plug conforming to the local regulations.3. After all connections have been made between the various components of thesystem, make certain that all power switches are set to off, then connect theline cords to the electrical power supply.The power switch is located at the top right-h<strong>and</strong> rear of the spectrometer.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!